Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published December 25, 2025 at 7:00 PM
Updated December 31, 2025
Site work for a water / sewer project in Sifton, Manitoba. Completed plans call for site work for a water / sewer project.
Reference Number 0000309309 Question Deadline 12/19/2025 at 12:00 PM CT Questions are submitted online No All enquiries regarding the Work may be made to: Fabio Albarran, EIT Junior Project Engineer 2nd Floor 280 Broadway Winnipeg, Manitoba R3C 0R8 (431) 323-0000 fabio.albarran@gov.mb.ca Enquiries regarding tendering or contract award may be made to: Manitoba Transportation and Infrastructure Tendering and Contracts 1630 215 Garry Street Winnipeg, Mb. R3C 3P3 204-945-3637 The scope of work includes reconstruction of the upstream slope riprap on the east dike at Oak Lake Dam including riprap removal, tree and vegetation clearing, regrading and sub cutting of the upstream slope, and new riprap placement. Official bid documents must be obtained from https://www.merx.com/mbgov/solicitations/open-bids/OAK-LAKE-DAM-EAST-DIKE-UPGRADES-MUNICIPALITY-OF-SIFTON/0000309309 and bid submissions must be done through the Merx platform. Award is subject to final approval
Award
Water / Sewer
$330,263.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 23, 2025
January 22, 2026
To Be Determined, Sifton, MB
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
