Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 2, 2026 at 7:00 PM
Updated February 3, 2026
Renovation of a transportation facility in Worcester, Massachusetts. Completed plans call for the renovation of a transportation facility.
The Worcester Regional Airport Modernization program includes a comprehensive series of construction, rehabilitation, and modernization projects designed to enhance operational efficiency, safety, sustainability, and passenger experience. Elements include updates to the Airport Passenger Terminal as well as campuswide improvements based on findings by the Massport Infrastructure Condition Assessment (MICA) and Utility Condition Assessment (UCA) teams, upgrades of parking and roads, both land- and airside, and evaluation of renewable energy opportunities. The program also includes the relocation of the Robert Goddard aviation history display to a permanent site near the airport. In accordance with Massachusetts General Laws, Chapter 149A, Sections 1 thru 13, Massport is seeking a highly qualified and competent Construction Manager (CM) to provide preconstruction services and implement the construction of the Project in accordance with an agreement where the basis for payment is the cost of the work plus a fee with a negotiated guaranteed maximum price. This Request for Qualifications (RFQ) is being utilized to prequalify and shortlist CM firms who will be invited to submit proposals in response to a Request for Proposals (RFP) to be issued by Massport. Question Deadline 01/12/2026 at 12:00 PM ET All questions relative to your submission shall be directed to CPBidQuestions@massport.com. In the subject lines of your email, please reference the MPA Project Name and Number. It is strictly prohibited for any proponent to contact anyone else from Massport about this project from the time of this solicitation until award of the project to the successful proponent. The project has a goal of substantially complete construction by Quarter 1, 2029. The Worcester Regional Airport program includes a comprehensive series of construction, rehabilitation, and modernization projects designed to enhance operational efficiency, safety, sustainability, and passenger experience. This airport will remain operational during this work. All work will maintain Worcester Airport Operations with minimal disruption. Key elements include the following. o Construction of 190 parking spaces on airport property Rehabilitate Maintenance Road and public parking lots. Upgrade the fire protection and fire alarm systems at the airport to meet current code. o Upgrade electrical capacity at the airport. o Design and construct the following based on Massport Infrastructure Condition Assessment (MICA) findings such as: o Replace failed exterior stair railing. o Repair damaged brickwork, fractured concrete, and damaged interior masonry finishes. o Replace deteriorated exterior sealants. o Prepare and paint exterior painted surfaces. o Remediate deterioration in the water pipe system, replace as required. o Repair roof top economizer, add economizer to HVAC system. o Replace plumbing fixtures and system with high-efficiency fixtures. o Replace existing lighting with LED fixtures. o Replace single-paned glazing with double/triple-paned glazing. o Implement potential for renewable power generation. o Repair/replace roofing with cool roofing system. o Replace wooden structural members. o Provide and install a UPS for critical data infrastructure. o Resurface pavement at front of building, providing proper drainage. o Repair Cold Storage Building (Building 6) per Massport Infrastructure Condition Assessment (MICA). (See Location F in Exhibit 5.1) o Several areas of the terminal are being studied for required upgrades and improvements. The execution of which will fall under the purview of the selected CM. The proposed updates include energy efficiency upgrades, interior finishes, terminal canopy modifications, wayfinding, back of house modifications, departure lounge modifications, and exterior door updates. Cost will, of course, determine what work is performed. (See Location G in Exhibit 5.1) o The creation of one additional bunk room for a single firefighter in the existing ARFF station. (See Location I in Exhibit 5.1) o Construction of findings that were found in the Utility Condition Assessment (UCA) in the vicinity of Buildings 2, 6, and 14. (See Location J in Exhibit 5.1)
Post-Bid
Transportation Terminals
$28,000,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 29, 2026
April 1, 2026
375 Airport Dr, Worcester, MA
Related To This Project
Worcester, MA
Bid Date: Dec 31 2025
Worcester, MA
Bid Date: Jan 06 2026
Worcester, MA
Bid Date: Jan 06 2026
Worcester, MA
Bid Date: Jan 21 2026
Worcester, MA
Bid Date: Jan 21 2026
Worcester, MA
Bid Date: Jan 21 2026
Worcester, MA
Bid Date: Jan 20 2026
Worcester, MA
Bid Date: Jan 21 2026
Worcester, MA
Bid Date: Dec 23 2025
Worcester, MA
--
Worcester, MA
Bid Date: Dec 15 2025
Worcester, MA
Bid Date: Dec 17 2025
Worcester, MA
Bid Date: Dec 03 2025
Worcester, MA
--
Worcester, MA
Bid Date: Dec 17 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.