Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 20, 2026 at 7:00 PM
Updated January 21, 2026
Renovation of an educational facility in Crystal River, Florida. Completed plans call for the renovation of a one-story above grade educational facility.
All prime contractors must hold a Citrus County School Board Certificate of Pre-qualification to bid on Citrus County School Board construction projects. Prime contractors must be pre-qualified by the Citrus County School Board prior to submitting a bid. Prime contractor's bids must be within the bid limits specified on their pre-qualification certificate. Bidders may obtain a maximum of two sets of Contract Documents from Verrando Engineering Co. Inc. upon deposit, refundable upon return of documents in satisfactory condition. Contract Documents are also available as Adobe PDF files for free via email request to Verrando Engineering Co. Inc. Pre-qualification requirements: All prime contractors must be pre-qualified by the Citrus County School Board and possess a Citrus County School Board Certificate of Pre-qualification. Bids submitted must be within the bid limits specified on their certificate.
Post-Bid
Educational
$500,000.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 20, 2026
March 6, 2026
344 North East Crystal St, Crystal River, FL
Related To This Project
Crystal River, FL
--
Crystal River, FL
Bid Date: Feb 19 2026
Crystal River, FL
--
Crystal River, FL
Bid Date: Nov 13 2025
Crystal River, FL
Bid Date: Nov 13 2025
Crystal River, FL
Bid Date: Sep 18 2025
Crystal River, FL
Bid Date: Sep 09 2025
Crystal River, FL
Bid Date: Sep 24 2025
Crystal River, FL
Bid Date: Aug 19 2025
Crystal River, FL
Bid Date: Jun 23 2025
Crystal River, FL
Bid Date: Jun 25 2025
Crystal River, FL
Bid Date: May 20 2025
Crystal River, FL
Bid Date: Apr 15 2025
Crystal River, FL
Bid Date: Oct 15 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
