BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2026 at 7:00 PM

Updated January 28, 2026

Site work and paving for a mixed-use development in Foristell, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

The proposed work includes the furnishing of materials, tools, equipment and labor necessary to construct WEST MEYER SHOULDERING PROJECT, STP-5414 (642) in St. Charles County, Missouri. The construction shall include all work incidental to the furnishing of materials, tools, equipment and labor necessary to construct the roadway improvements along with a multi-use path, pavement widening, curb and gutter, curb ramps, drainage structures and other appurtenances. All bidders must meet the MoDOT requirements as a Contractor at least seven (7) days prior to bid opening in accordance with Section 102.2 of the St. Charles County Standard Specifications for Arterial Highway Construction The COUNTY reserves the right to reject any and all Bids, to waive informalities therein to determine the lowest, responsive, responsible bidder, and to approve the bond. No Bid may be withdrawn for a period of sixty (60) days subsequent to the specified time for receipt of Bids. MODOT - West Meyer Shouldering Project Question Deadline 12/29/2025 All requests for clarifications on these bidding documents must be received in writing at least one week prior to the bid opening. From Highway W to Bridge over a tributary of McCoy Creek (1,800 feet east of Duenke Road) Saint Charles County The proposed work includes the furnishing of materials, tools, equipment and labor necessary to construct WEST MEYER SHOULDERING PROJECT, STP-5414 (642) in St. Charles County, Missouri. The construction shall include all work incidental to the furnishing of materials, tools, equipment and labor necessary to construct the roadway improvements along with a multi-use path, pavement widening, curb and gutter, curb ramps, drainage structures and other appurtenances. Regardless of when the work is begun on this contract, all work shall be completed within 275 Calender Days from the date of the written Notice to Proceed. Work zone traffic management shall be in accordance with applicable portions of Division 100 and Division 600 of the Standard Specifications, and specifically as follows.

Bid Results

Roads / Highways

$4,748,147.00

Public - County

Paving, Site Work

171

10

2

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
290
Active Projects
157
Bidding Soon
1,410
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2026

February 26, 2026

Project location map

W Meyer Rd, Foristell, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.