Published May 30, 2026 at 8:00 PM
Updated May 31, 2026
Site work and paving for a mixed-use development in Foristell, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
SCI No. 2021-1409.10 The proposed work includes the furnishing of materials, tools, equipment and labor necessary to construct West Meyer Shouldering Project, in St. Charles County, Missouri. The construction shall include all work incidental to the furnishing of materials, tools, equipment and labor necessary to construct the roadway improvements along with a multi-use path, pavement widening, curb and gutter, curb ramps, drainage structures and other appurtenances. All bidders must meet the MoDOT requirements as a Contractor at least seven (7) days prior to bid opening in accordance with Section 102.2 of the St. Charles County Standard Specifications for Arterial Highway Construction Question Deadline 06/18/2026 All requests for clarifications on these bidding documents must be received in writing at least one week prior to the bid opening. The County reserves the right to reject any and all Bids, to waive informalities therein to determine the lowest, responsive, responsible bidder, and to approve the bond. No Bid may be withdrawn for a period of sixty (60) days subsequent to the specified time for receipt of Bids. MODOT - West Meyer Shouldering Project From Highway W to Bridge over a tributary of McCoy Creek (1,800 feet east of Duenke Road) Saint Charles County The proposed work includes the furnishing of materials, tools, equipment and labor necessary to construct WEST MEYER SHOULDERING PROJECT, STP-5414 (642) in St. Charles County, Missouri. The construction shall include all work incidental to the furnishing of materials, tools, equipment and labor necessary to construct the roadway improvements along with a multi-use path, pavement widening, curb and gutter, curb ramps, drainage structures and other appurtenances. Regardless of when the work is begun on this contract, all work shall be completed within 275 Calender Days from the date of the written Notice to Proceed. Work zone traffic management shall be in accordance with applicable portions of Division 100 and Division 600 of the Standard Specifications, and specifically as follows.
GC Bidding
Roads / Highways
$4,700,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 25, 2026
August 24, 2026
W Meyer Rd, Foristell, MO