Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 11, 2025 at 7:00 PM
Updated December 12, 2025
Site work, paving and renovation of a mixed-use development in Offutt AFB, Nebraska. Working plans call for the renovation of a military facility; for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The scope of work includes the construction of a fully enclosed approximately 315,000 SF two-bay maintenance hangar with operations space to accommodate maintenance activities for two Boeing 747-8i aircraft. The facility will also include an Aircraft Maintenance Unit (AMU), approximately 68,000 SF of consolidated tool kit (CTK) space, and approximately 78,000 SF of contractor logistics support (CLS) supply space. Construction will involve concrete foundation and floor slab, steel high bay structure, standing seam metal roof, dual bridge crane telescopic maintenance platforms, motorized hangar doors and tracks, fire alarm and suppression systems, and all necessary support features. The hangar will incorporate administrative areas, tool rooms, supply and bench stock areas, storage, shop spaces, emergency shower and eyewash stations, locker rooms with showers, break areas, and secure spaces. Sensitive and Special Access Program spaces must comply with Intelligence Community Directive 705 standards. The project includes a generator per AFI 32-1062, utilities, pavements, site improvements, communications, and all other necessary support for a complete and usable facility. Airfield pavement work will include clearing, excavation, placement of base material, concrete pavement, asphalt shoulders, airfield markings, stormwater retention, storm drainage, lighting, and related support. Cybersecurity measures will be applied to facility-related control systems in accordance with current DoD criteria. The facility will be designed as permanent construction per Department of Defense Unified Facilities Criteria 1-200-01 and will comply with antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. The Method of Contractor Selection has not been determined at this Time.
Final Planning
Military
$75,000,000.00
Public - Federal
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2026
To Be Determined, Offutt AFB, NE
Related To This Project
Offutt AFB, NE
Bid Date: Jan 15 2026
Offutt AFB, NE
Bid Date: Jan 07 2026
Offutt AFB, NE
Bid Date: Jan 06 2026
Offutt AFB, NE
--
Offutt AFB, NE
Bid Date: Feb 19 2026
Offutt AFB, NE
Bid Date: Mar 09 2026
Offutt AFB, NE
Bid Date: Mar 11 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
