BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 17, 2025 at 7:00 PM

Updated December 20, 2025

Site work for a municipal facility in Virginia Beach, Virginia. Completed plans call for site work for a municipal facility.

The successful Bidder (Contractor) shall provide all effort and materials necessary to provide for solid waste collection and disposal services to designated facilities operated by the City of Virginia Beach (CVB). Work shall be performed on a regular schedule and/or on an as needed basis as specified, and must include, but not be limited to, the provision of bulk containers, servicing of containers, and disposal of the material. Specific Requirements: 1. Collection Servicestypes shall include: i. Front load service for 8, 6,and 4 cubic yard (CY) containers ii. Roll Offservice for20, 30, and 40 CY containers iii. Compactor Service forboth City-owned and contractor provided compactors iv. 96-gallon carts 2. Service schedule i. Attachment H provides the current list of the City service sites, quantity, size, and type of containers as well as the frequency of collections. Service needs are subject to change. ii. The City reserves the right to delete and add facilities, delete and add the number of containers located at each facility, and adjust the frequency of collections at each facility, and modify the services provided as it deems necessary. iii. Contractor shall service all locations on a regularly scheduled basis as designated by the City. Any container not emptied on schedule by the Contractor, for any reason, shall be emptied the day the Contractor is made aware of the situation when contacted prior to noon of that day. If the Contractor is made aware of the situation after noon, the containershall be emptied by noon the following day. City inspections will determine whether the Contractor has fulfilled its obligations. Containers not emptied within the above time frame will result in a reduction from the invoice of $100per container per day. iv. Containers shall be emptied by the Contractor up to seven days per week, including holidays, as designated by the City. v. All containers sharing a common boundary with residential areas shall be emptied after 7:00 a.m. Contractor shall provide roll off service for up to 12 loads per each 12-month term of the contract free of charge for special programs. Use of the containers will be administered by the C i t y ' s Waste Management Division to support special programs conducted by the Community or the City. Containers provided shall be either 20 or 30 cubic yard roll-off containers as specified by the City. Services shall include solid waste containers,collection, anddisposalservices.

Post-Bid

Municipal

$900,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
53
Bidding Soon
866
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2025

January 19, 2026

Project location map

To be determined, Virginia Beach, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.