Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 19, 2026 at 7:00 PM
Updated February 20, 2026
Site work for a mixed-use development in Los Altos Hills, California. Working plans call for site work for a educational facility; and swimming pool.
**As of February 19th, 2026, prequalification were cancelled. * Prequalification for Plumbing Contractor to modernize the Pool and Physical Education Complex at Foothill College. Response Types Response File Type of Award Lump Sum License Requirements Class C-36 Plumbing Contractors Question Deadline 01/14/2026 at 12:00 PM PT Online Q&A Yes The scope of work includes, but is not limited to, the following improvements: _ Expansion of the existing pool to Olympic size, including a new pool shell _ Construction of a new pool deck, surge tank, and pool pump room _ Replacement of the pool plumbing, filtration, and chemical treatment systems _ Installation of new underwater lighting and exterior site lighting _ Addition of a new canopy over existing bleachers and decorative perimeter fencing _ Replacement of mechanical and electrical systems in the main mechanical room, including temporary systems to maintain occupancy during construction _ Replacement of select mechanical equipment in each building and installation of a new Automated Logic Corporation (ALC) Building Management System _ Connection and integration of the building and pool heating systems to a low-temperature heat source from an adjacent heat pump plant (provided by others) _ Installation of backup natural gas boilers _ Removal of existing concrete bleachers and construction of new retaining walls _ Application of brick veneer to new exterior concrete walls _ Improvements to accessibility and emergency egress throughout the complex _ Renovation of four locker rooms, including showers and changing areas _ Conversion of an existing team room into an all-gender locker room _ Upgrades to fire suppression and HVAC systems _ Installation of new electric vehicle (EV) charging stations _ Replacement and protective coatings of wood siding on Buildings 2500 and 2600 _ Replace wood railings throughout the complex _ Replacement of 11 or more exposed glulam beam tails on building 2600, with application of protective coatings to all glulams and eaves on buildings 2500 and 2600
Final Planning
Educational
$30,000,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 27, 2026
July 19, 2026
12345 El Monte Rd, Los Altos Hills, CA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
