Site work and paving for a mixed-use development in Chillicothe, Missouri. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The work to be performed generally consists of the removal and installation of stormwater inlet, installation of curb and gutter, placement of aggregate parking lot, lowering of existing manholes, and placement of concrete pavement. Bidders with questions concerning this Invitation may contact Michael Atkinson, P.E., Allgeier, Martin and Associates, Inc., 7231 East 24th Street, Joplin, Missouri 64804, 417-680-7200. The training must be completed within sixty (60) days of the date work on the project commences The work consists of furnishing all labor, materials, equipment, tools, and supervision to complete incidental and miscellaneous items associated with related work as shown on the plans, but not specifically identified in the bid schedule. This work typically consists of, but is not limited to, installation of drainage structures, piping and culverts, pipe connections to box culverts, minor adjustments of improvements with considerations to locations of existing pipe joints, pavement repair, grading, vegetative restoration, and any other miscellaneous and incidental items that may be shown on the drawings or required for the complete installation of the work. 2. LOCATION 2.1 In the City of Chillicothe, Missouri, Livingston County as shown on the drawings. 2.2 Street Designations: Alleyway (Between Clay St.-Ann St. and Between Washington St.-Locust St.) Work includes, but is not limited to construction of fill, compaction, pavement removal and installation, curb and gutter installation, repair, and installation, and any other miscellaneous and incidental items that may be shown on the drawings or are required for a complete installation of the work. 5.3 Work includes, but is not limited to, erosion control, material sampling and testing, certifications, and adjustment of existing structures. 5.4 Inclusive in the work is close coordination with all appropriate jurisdictional agencies and responsibility for construction standards, traffic control, and safety requirements of these agencies.
Award
Water / Sewer
$206,749.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 15, 2026
February 16, 2026
Multiple Locations, Chillicothe, MO
Related To This Project
Chillicothe, MO
Bid Date: Feb 11 2026
Chillicothe, MO
Bid Date: Feb 25 2026
Chillicothe, MO
Bid Date: Feb 10 2026
Chillicothe, MO
Bid Date: Feb 10 2026
Chillicothe, MO
Bid Date: Mar 20 2026
Chillicothe, MO
Bid Date: Mar 17 2026
Chillicothe, MO
Bid Date: Mar 30 2026
Chillicothe, MO
Bid Date: Mar 13 2026
Chillicothe, MO
Bid Date: Nov 18 2025
Chillicothe, MO
Bid Date: Oct 07 2025
Chillicothe, MO
Bid Date: Sep 19 2025
Chillicothe, MO
--
Chillicothe, MO
--
Chillicothe, MO
Bid Date: Sep 12 2025
Chillicothe, MO
Bid Date: Aug 18 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.