BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 19, 2026 at 8:00 PM

Updated March 20, 2026

Site work and paving for a mixed-use development in Chillicothe, Missouri. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The work to be performed generally consists of the removal and installation of stormwater inlet, installation of curb and gutter, placement of aggregate parking lot, lowering of existing manholes, and placement of concrete pavement. Bidders with questions concerning this Invitation may contact Michael Atkinson, P.E., Allgeier, Martin and Associates, Inc., 7231 East 24th Street, Joplin, Missouri 64804, 417-680-7200. The training must be completed within sixty (60) days of the date work on the project commences The work consists of furnishing all labor, materials, equipment, tools, and supervision to complete incidental and miscellaneous items associated with related work as shown on the plans, but not specifically identified in the bid schedule. This work typically consists of, but is not limited to, installation of drainage structures, piping and culverts, pipe connections to box culverts, minor adjustments of improvements with considerations to locations of existing pipe joints, pavement repair, grading, vegetative restoration, and any other miscellaneous and incidental items that may be shown on the drawings or required for the complete installation of the work. 2. LOCATION 2.1 In the City of Chillicothe, Missouri, Livingston County as shown on the drawings. 2.2 Street Designations: Alleyway (Between Clay St.-Ann St. and Between Washington St.-Locust St.) Work includes, but is not limited to construction of fill, compaction, pavement removal and installation, curb and gutter installation, repair, and installation, and any other miscellaneous and incidental items that may be shown on the drawings or are required for a complete installation of the work. 5.3 Work includes, but is not limited to, erosion control, material sampling and testing, certifications, and adjustment of existing structures. 5.4 Inclusive in the work is close coordination with all appropriate jurisdictional agencies and responsibility for construction standards, traffic control, and safety requirements of these agencies.

Award

Water / Sewer

$206,749.00

Public - City

Paving, Site Work

28

12

2

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
62
Bidding Soon
848
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2026

February 16, 2026

Project location map

Multiple Locations, Chillicothe, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.