BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 17, 2025 at 7:00 PM

Updated February 20, 2026

Site work for an educational facility in Northville, Michigan. Completed plans call for site work for a one-story above grade educational facility.

The work involves Northville Public Schools Structured Cabling Systems, Project No. 25-NPS-SCS-01. Bidders must submit sealed bids as detailed in the bid specifications and proposal forms. Required documents include a sworn and notarized statement disclosing any familial relationship between the Owner and the bidder as defined by Michigan Public Act No. 232 of 2004, an Iran Economic Sanctions Act Disclosure statement as defined in Michigan Public Act No. 517 of 2012, and an Affidavit of Compliance – Criminal Background Check. Each bid must include a certified check, cashier’s check, money order, or bid bond made payable to Northville Public Schools in the amount of five percent (5%) of the base bid as a bid guarantee. Bids without these documents will not be accepted. Withdrawal of any bid is prohibited for ninety (90) days after the bid opening. The Owner reserves the right to reject any or all bids, in whole or in part, based on compliance with bid requirements, accompanying bid guarantee, and other required data. Bids may be adjusted by unit prices to ensure comparability with respect to required materials. The Owner may accept alternates in any order or combination and determine the low bidder on the basis of the sum of the base bid and accepted alternates. Question Deadline Jan 09, 2026 at 12:00 PM E-mail all questions to: 1. Brandon Julian 2. Email: bjulian@wrighthunter.com B. All questions and answers will be shared with all Vendors PROJECT SUMMARY A. Provide all labor, materials, equipment and services necessary to furnish, install, program, test and certify fully operational Structured Cabling System. B. All work shall be in accordance with the true intent of these drawings and specifications, and as required to leave all systems complete and in satisfactory operating condition, excluding those items listed under Work provided by Others. C. The Structured Cabling System shall include, but are not limited to, the following principal components and materials: 1. Category 6/6A Network Cabling 2. Muli-Mode Optical Fiber Cabling 3. Cabinets, Racks, & Enclosures 4. Professional Training System Warranties D. The Structured Cabling System scope of work at Northville High School shall include the removal, re-termination, re-labeling, and testing 3,312 Category 5e and Category 6 cables. E. The Structured Cabling System equipment and software shall be new, of modern design, and current standard production of the various manufacturers. F. The Contractor shall verify dimensions and conditions at the job site prior to installation, and perform installation in accordance with these specifications, manufacturer’s recommendations and the latest edition or revision of all applicable codes and standards. G. The Contractor shall provide any additional items, not specifically mentioned herein, necessary to meet system requirements as specified, without claim for additional pay.

Post-Bid

Educational

$200,000.00

Public - City

Site Work

30

7

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
10
Bidding Soon
1,983
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2026

April 1, 2026

Project location map

Multiple Locations, Northville, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.