BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 17, 2025 at 7:00 PM

Updated December 31, 2025

Site work for an industrial development in Harrisburg, Pennsylvania. Completed plans call for site work for an industrial development.

Harrisburg Site Cleanup. Required equipment must meet the attached specifications and delivery timeframes. All contractor performance shall be conducted in a safe manner and comply with all applicable Federal, state, and local laws and regulations, as well as installation policies. The contractor is responsible for all required documentation and service-related requirements, including installation access, and must coordinate as necessary with the site POC. All offerors shall submit their disposal plan, which must include the location where the material will be shredded. a. The Defense Logistics Agency Disposition Services (DLA DS), a Major Subordinate Command of the Defense Logistics Agency (DLA), is responsible for the disposition and reutilization of excess and surplus property for the Department of Defense (DoD). DLA DS Susquehanna requires professional services to complete DLA property removal. b. This PWS defines the requirements for the DLA property removal/mutilation located at 1500 N. Cameron St., Harrisburg, PA 17103. All work, including property destruction, recycling, and disposal, must be performed at facilities located within a 50-mile radius of DLA DS Susquehanna (5450 Carlisle Pike Bldg. 206s, Mechanicsburg, PA 17103). c. This is a Firm-Fixed Price (FFP) contract. The performance period (PoP) shall not exceed three (3) months from the contract award date, as specified in block 3 of the SF1449. All on-site work shall be performed Monday through Friday, between the hours of 0730 and 1530, excluding Federal holidays. d. The Contracting Officer (KO) may grant an extension due to extenuating circumstances. The Contractor must submit a formal written request for an extension to the KO no later than ten (10) business days prior to the end of the PoP. The request must detail the reasons for the delay, include substantiated supporting documentation, and provide an estimated date for completion.

Post-Bid

Industrial

$10,000,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
375
Active Projects
144
Bidding Soon
1,917
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 30, 2025

February 13, 2026

Project location map

1500 N Cameron St, Harrisburg, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.