Published January 13, 2026 at 7:00 PM

Updated January 14, 2026

Site work and paving for a road / highway in Bedford, New Hampshire. Completed plans call for site work for a one-story above grade road / highway.

The work may include resurfacing, reconstruction, utility and drainage work, as well as excavation as required by the Town of Bedford in the Local Road rehabilitation program. The program will include approximately $4.2M of work over two years, 2026-2027, and may include the entirety or segments of the following roads: Aspen Lane, Balsam Court, Bedford Street, Bellemore Drive, Bourbon Street, Briar Court, Buttonwood Road, Cajun Court, Camelot Road, Campbell Road, Cotton Circle, Covenant Way, Greeley Hill Road, Hersey Street, Kalmia Way, Keene Street, Liberty Hill Road, Line Road, Mack Street, Ministerial Branch, Neighborhood Court, North Amherst Road, Orchard Hill Circle, Palomino Lane, Plains Road, Plummer Hill Road, Rockwood Court, Rolling Woods Drive, Ruth Street, Seton Drive, Stonehenge Road, Tiffany Lane, Wayside Drive, West Drive, White Avenue, Whisper Drive, Whittemore Street, Willowbrook Court, and Woodbury Lane, as well as other roads as directed by the Town. The Town reserves the right to remove or replace roads in the program as needs arise, or to cease work on the project in the event that all dedicated monies have been expended. Approximately $2.0M of work will need to be accomplished in 2026, and approximately $2.2M of work will need to be accomplished in 2027. All work shall be done in accordance with the contract documents and specifications prepared by the Town of Bedford, New Hampshire. Bidders must supply all the information required by the proposal forms. A certified check, drawn upon a state or national bank, or a bid bond, in the penal sum of five percent (5%) of the total maximum bid price will be required with each bid. The Town of Bedford reserves the right to reject any and all bids and to waive any informalities in bids received. No bidder may withdraw his/her bid within sixty (60) days from bid opening. Pre-qualification requirements: All Bidders must be prequalified by the New Hampshire Department of Transportation. The prequalification Statement is due together with the bid submission. Question Deadline 12/22/2025 at 12:00 PM ET Bidders are encouraged to submit questions via email to publicworks@bedfordnh.org; however, the Owner assumes no liability for ensuring accurate and complete email transmission/receipt and is not responsible to acknowledge receipt. Inquiries must be submitted citing the RFP title, Page, Section, and received Brian Desfosses, Acting DPW Director 55 Constitution Drive Bedford, NH 03110 Email: bdesfosses@bedfordnh.org

Award

Roads / Highways

$5,169,279.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
9
Bidding Soon
1,981
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2026

April 15, 2026

Project location map

To be determined, Bedford, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.