Published January 19, 2026 at 7:00 PM

Updated January 20, 2026

Remodeling and renovation of an educational facility in Huntsville, Alabama. Completed plans call for the renovation of a 90,000-square-foot educational facility.

**As of January 19, 2026, this project has not yet been awarded. A timeline for the award has not yet been established.** This project consists of modifying/renovating approximately 90,000SF of the existing Bevill Center on the campus of UAH. All interior appurtenances as well as mechanical, electrical, plumbing, & fire protection shall be removed & re-installed. Exterior work shall consist of brick removal/replacement, installation of curtain wall/storefront glazing systems, as well as a complete re-installation of the roofing system. Bid Packages: 0100 - General Requirements 0146 - Hoisting 0151 - Temporary Stairs 0160 - Tower Crane 0190 - Scheduling 0211 - Surveying 0230 - Earthwork 0236 - Soil Treatment 0240 - Site Utilities 0245 - Deep Foundations 0250 - Interior Demolition 0270 - Asphalt Paving 0280 - Fences & Gates 0285 - Site Furnishings 0287 - Unit Pavers 0290 - Landscaping / Irrigation 0300 - Concrete Subcontractors 0330 - Concrete Vendor 0400 - Masonry 0500 - Structural Steel / Joists / Deck 0570 - Decorative Metal Railings 0640 - Millwork 0710 - Dampproof/Waterproof/Caulk 0750 - Roofing & Sheetmetal 0770 - Metal Panels 0805 - Hollow Metal / Wood Doors/ Hardware 0880 - Glass/Glazing/Storefront 0910 - Drywall / Acoustical 0930 - Hard Flooring 0960 - Soft Flooring 0990 - Painting & Wallcoverings 1000 - Miscellaneous Specialties 1010 - Signage 1022 - Demountable Partitions 1025 - Wall Protection 1220 - Window Treatment 1530 - Fire Protection 1550 - HVAC & Plumbing 1600 - Electrical Mechanical i. Mechanical Ductwork ii. Mechanical Piping 1 1/4" in diameter or greater (including insulation) iii. Racked Piping - any grouping of piping that creates a barrier greater than 1 1/4" iv. Ceiling Devices such as diffusers and registers v. All insulation on both ductwork and piping on separate layers vi. Mechanical Equipment -- both major and minor equipment to actual approved sizing vii. Fire, Smoke, and Control Dampers with required clearances viii. Clearances required for operational/maintenance including but not limited to: 1. All Equipment 2. Access Panels 3. VAV Boxes 4. Fan coil units 5. Terminal air distribution boxes 6. Air Handling Units (AHU) 7. Valves 8. Gauge Reading ix. Valves x. Hangers including special considerations like seismic bracing xi. Future and existing work on separate layers xii. Sleeves for penetrations in slabs, beams, or prioritywalls. b. Plumbing (underground and overhead) i. Plumbing Piping 1 1/4" in diameter or greater (including insulation) 1. Rain Leader 2. Overflow Drain 3. Vent 4. Waste Water/Sanitary 5. Domestic Cold Water 6. Domestic HotWater 7. Medical Gas / Vacuum / Specialty Gas ii. Gravity piping to be modeled with necessary slope iii. Racked Piping --any grouping of piping that creates a barrier greater than 1 1/4" iv. Plumbing Equipment and Fixtures v. Valves vi. All insulation on separate layers vii. Clearances including range of motion valve clearances viii. Hangers including special considerations likeseismic ix. Future and existing work on separate layers x. Sleeves for penetrations in slabs, beams, or prioritywalls should be shown on a drawing. c. Electrical (underground and overhead) i. Individual Electrical Conduit 1 1/4" or greater ii. Racked Conduit -- any grouping of conduit that creates a barrier greater than 1 1/4" iii. Electrical Lighting and Ceiling Devices iv. Electrical Equipment and Clearances (both out, above to structure, and below) v. Electrical Panels and PanelSchedules vi. Electrical Pull Boxes and Junction Boxes with requiredclearances vii. Bus Ducts, High Voltage Runs, Main Feeders, and SubFeeders viii. Cable Tray with required access clearance ix. Electrical Room -- entire room clearance to make project team aware of other trade work in electrical rooms x. Hangers including special considerations likeseismic xi. Future and existing work on separatelayers xii. Sleeves for penetrations in slabs, beams, or prioritywalls should be shown on a drawing. h. Fire Protection i. All Fire Protection Piping and Devices ii. Fire mains, branches, and head drops iii. Equipment -- both major and minor equipment to actual approved sizing iv. Control Panels with clearances both out and above as required by code v. Hangers including special considerations likeseismic vi. Future and existing work on separate layers vii. Sleeves for penetrations in slabs, beams, or prioritywalls should be shown on a drawing. i. Steel Fabricators Model i. All structural members and connections within scope of work. j. Metal Stud Framing (as required per project) i. All wall interior and exterior and ceiling framing components ii. Wall studs, king studs, soffit framing, kickers, ceiling framing iii. Shop Drawings that incorporate openings after MEP coordination k. Special Systems Model (if needed) i. Fire Alarm Devices ii. VESDA iii. Clean Agent Fire Protection equipment, piping, and panels iv. Electrical Low VoltageWiring v. Security System Devices vi. Pneumatic TubeSystem vii. Nurse Call System Devices viii.Telemetry Systems ix. KitchenEquipment x. Baggage Handling Systems xi. Owner Provided OverheadEquipment

Post-Bid

Educational

$40,000,000.00

Public - State/Provincial

Remodeling, Renovation

317

31

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
48
Bidding Soon
789
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2026

March 16, 2026

Project location map

550 Sparkman Dr NW, Huntsville, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.