BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 28, 2026 at 7:00 PM

Updated January 29, 2026

Site work and paving for a mixed-use development in Lawrenceville, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Lawrenceville Raised Intersections project is located at two (2) intersections, Pike Street and Clayton Street, and Crogan Street and Perry Street, in the heart of Lawrenceville, Georgia. Each intersection has a disturbed area of approximately 0.20 acres. The proposed project includes raising the intersections approximately 6 to have the intersection flush with the surrounding sidewalks. The intent is to raise the intersections while minimizing the disturbance to the existing sidewalks and brick pavers to slow traffic entering the intersections and create a safer environment for pedestrians. All construction operations must be conducted from 9 PM to 5 AM on weekdays. Contractor to follow the Traffic Control Plans and allow moving traffic in the intersections at all times. All construction areas must be temporarily fenced, and pedestrian traffic must be rerouted with appropriate MUTCD signage. Contractor must start construction at Clayton @ Pike intersection and, once it is substantially completed, start at Crogan @ Perry (two mobilizations accounted). The construction staging area is located near 294 W Pike St (near bridge). The quantities shown on sheet 6-01 are for reference only, the quantities on the bidding form are the final and valid for this Contract. Questions regarding bids should be directed in writing to Chris Duncan, CPPB, Buyer at chris.duncan@lawrencevillega.org no later than 3:00 P.M. on January 9, 2026. A. This section covers all clearing and grubbing together with the removal and disposal ofitems. B. Related Work Specified Elsewhere: 1. Division 31, Section Grading for site excavating, filling, disposal of surplus earth and debris and finishing grading. 2. Division 31, Section Erosion and Sedimentation Control A. This Section covers excavation, fill, disposal of surplus earth and debris, finished grading and rock. B. Related Work Specified Elsewhere: 1. Division 02, Section Demolition. 2. Division 31, Section Clearing and Grubbing. 3. Division 31, Section Erosion and Sedimentation Control. A. This Section covers the complete installation of all storm systems. 1. All storm systems shall be constructed to the locations shown on theDrawings. 2. All Work shall be in conformance with the requirement of local codes andordinances. B. Related Work Specified Elsewhere: 1. Refer to Section 31 22 00, Grading. 2. Refer to Section 31 25 00, Erosion and Sedimentation Control. 3. Refer to Section 33 10 00, Water Utilities, for other exterior utilities. 4. Refer to Section 03 30 00, Cast-In-Place Concrete, for concrete specifications. A. This Section describes the methods by which measurement will be made of the quantities for which payment will be made for the PROJECT. B. The project is to be bid as a unit price contract.

Post-Bid

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

46

15

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
1
Bidding Soon
1,099
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2026

February 19, 2026

Project location map

Multiple Locations, Lawrenceville, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.