Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published June 26, 2026 at 8:00 PM
Updated July 8, 2026
Renovation of a laboratory facility in Pascagoula, Mississippi. Working plans call for the renovation of a laboratory facility.
The scope of work includes a design-build project for the repair and renovation of the Gulf Marine Service Facility (GMSF) and associated wharf repairs at NOAA's Pascagoula Lab facility. The contractor will provide comprehensive design and construction services to restore and upgrade the facility and wharf infrastructure to meet operational requirements. Work will involve structural repairs, renovations, and improvements to ensure functionality, safety, and compliance with applicable standards. The project requires a qualified design-build team capable of managing all phases of design and construction, including planning, engineering, and execution of repairs for heavy and civil engineering components. The effort will emphasize durability, sustainability, and cost-effectiveness while maintaining continuity of operations at the marine service facility. The estimated range for this project is between $11 million to $13.5 million. Location: 151 Watts Ave, Pascagoula, MS 39567. As of April 6, 2026, the project is currently under evaluation stage. An issuance of short-listed firms has not been released. A design build firm selection timeline has not been disclosed.
Final Planning
Laboratories
$13,500,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2027
151 Watts Ave, Pascagoula, MS
Related To This Project
Pascagoula, MS
Bid Date: Jan 21 2026
Pascagoula, MS
Bid Date: Dec 08 2021
Pascagoula, MS
Bid Date: Sep 22 2021
Pascagoula, MS
Bid Date: Sep 09 2021
Pascagoula, MS
Bid Date: Dec 08 2021
Pascagoula, MS
Bid Date: Nov 24 2021
Pascagoula, MS
Bid Date: Mar 01 2021
Pascagoula, MS
--
Pascagoula, MS
Bid Date: Jan 20 2026
Pascagoula, MS
Bid Date: Dec 09 2025
Pascagoula, MS
Bid Date: Dec 03 2025
Pascagoula, MS
Bid Date: Dec 03 2025
Pascagoula, MS
Bid Date: Dec 10 2025
Pascagoula, MS
Bid Date: Dec 09 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed