Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 23, 2025 at 7:00 PM
Updated December 24, 2025
Site work, paving and new construction of a mixed-use development in Toronto, Ontario. Completed plans call for the construction of a multi-residential development; for site work for a multi-residential development; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Reference Number 0000309792 Question Acceptance Deadline 2026/01/09 12:00:00 PM EST In the summer of 2024, the Council of the City of Toronto (the "City") adopted Official Plan Amendment 729, Zoning By-law 904-2024, and Zoning By-law 871-2024, to permit construction of the Buildings (as defined below) on the lands legally described as: Lot 1 on Plan 599 City West; City of Toronto, as in PIN 21274-0048 (LT); and Lots 2 to 4 on Plan 599 City West; Lots 21 to 22 on Plan 371 City West; Part Lot 20 on Plan 371 City West; designated as Part 1 and 2 on 64R-16052; City of Toronto, as in PIN 21274-0047 (LT), and municipally known as 1113-1125 Dundas Street West, Toronto (collectively, the "Site"). Located in in Toronto's vibrant Queen West neighborhood, the Site occupies a prime position east of Ossington Avenue on the south side of Dundas Avenue West, as indicated in the map below. The Site is connected to public transit via the 505 Dundas streetcar and is within walking distance of the Ossington subway station. The proposed design, construction and redevelopment of the Site includes the following elements: a ten (10) storey mass timber mixed-use building along the north side of the Site fronting Dundas Street West, featuring 194 m2 of ground-floor non-residential space, residential units above, and on-site amenities (the "Residential Building"); and a one (1) storey building at the rear (south) of the Site, north of the existing laneway, dedicated to bicycle parking (the "Bicycle Building" and together with the Residential Building, the "Buildings"); an outdoor amenity space is between the Buildings; a total site area of 1,699 m2, including 5,957 m2 of gross floor area ("GFA") with an estimated 94 residential units in the Residential Building; no vehicular parking; and the Residential Building will harness clean, renewable geothermal energy providing efficient heating in winter and cooling in summer while significantly reducing carbon emissions, (collectively, the "Project"). Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
GC Bidding
Multi-Residential
$30,000,000.00
Public - City
New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 21, 2026
March 23, 2026
1125 Dundas St W, Toronto, ON
Related To This Project
Toronto, ON
Bid Date: Dec 18 2025
Toronto, ON
Bid Date: Dec 18 2025
Toronto, ON
Bid Date: Dec 18 2025
Toronto, ON
Bid Date: Jan 26 2026
Toronto, ON
--
Toronto, ON
Bid Date: Dec 18 2025
Toronto, ON
--
Toronto, ON
--
Toronto, ON
Bid Date: Jan 14 2026
Toronto, ON
Bid Date: Jan 15 2026
Toronto, ON
--
Toronto, ON
Bid Date: Dec 17 2025
Toronto, ON
Bid Date: Feb 04 2026
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
