BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2026 at 7:00 PM

Updated February 5, 2026

Site work and paving for a road / highway in Kelowna, British Columbia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The City of Kelowna is seeking proposals from qualified contractors for the construction of the Burtch 3 DCC project, which is the reconstruction of Burtch Road between Highway 97 and Glenmore Road to a four-lane arterial, in coordination with the redevelopment of Parkinson Recreation Centre. The project was recommended in the 2040 Transportation Master Plan to improve the north-south connectivity and traffic capacity between Glenmore Road and KLO Road (in conjunction with the Burtch Extension). The project includes upgrades and widening to Burtch Road and Bernard Avenue, active transportation improvements, and improvements to intersections on Burtch Road and Bernard Avenue between Highway 97 and Glenmore Road. The intersection improvements include: Burtch/Harvey intersection: a new protected left-turn (green arrow signal) for northbound and southbound traffic on Burtch Road approaching Hwy 97/Harvey, an extended southbound left turn lane on Burtch approaching Highway 97, an extended eastbound left turn lane on Highway 97, addition of a through lane in each direction of traffic on Burtch Road, and changing the existing conventional right-turn channels into smart channels with a sharper angle to improve safety. Burtch/Lawrence intersection: addition of a traffic signal to improve access to the neighborhood and enable pedestrians and cyclists to safely access the new multi-use path on the east side of Burtch Road, which will connect to the Okanagan Rail Trail, Highway 97 overpass, and new Parkinson Recreation Centre. Burtch/RPRC intersection: addition of a traffic signal to improve access to the redeveloped PRC site and Apple Bowl site. Bernard/Burtch intersection: creation of a longer eastbound right-turn lane from Bernard Avenue to Burtch Road and a new northbound smart channel right turn from Burtch Road to Bernard Avenue, which will free flow into an additional eastbound lane on Bernard Avenue. Bernard/Cherry Crescent East intersection: addition of a traffic signal to improve access to the neighbourhood and enable pedestrians to safely cross Bernard Avenue to use the new stairs and ramp to the new Parkinson Recreation Centre site. The Work can be briefly summarized as follows: 24,800m2 of asphalt paving 1,860 m of barrier curb and gutter 860m of Type E curb and 184m of concrete edger for the ATC construction Sanitary sewer revisions 2,170 m2 of concrete sidewalk 1,100 vertical m2 of MSE walls Reconstruction of 2 existing traffic signals (Burtch/Harvey and Burtch/Bernard) and the construction of 3 new traffic signals (Burtch/Lawrence, Burtch/Access to Apple Bowl, and Bernard/Cherry Cres. E) Documents can be obtained from https://kelowna.bonfirehub.ca/opportunities/99615 Question Deadline 01/21/2026 submitted through the Bonfire Opportunity, 7 business days prior to Closing Date Intent to Bid Due Date: Feb 12th 2026, 2:00 PM PST

GC Bidding

Roads / Highways

$15,000,000.00

Public - City

Paving, Site Work

123

18

42

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
26
Bidding Soon
309
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.