Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 20, 2026 at 8:00 PM

Updated March 21, 2026

Site work for a water / sewer project in Bluffton, Alberta. Completed plans call for site work for a water / sewer project.

FILTRATION SYSTEM UPGRADE GULL LAKE PUMP HOUSE APPROXIMATE QUANTITIES: 1 lump sum Care of Water (Special Provisions) 1 lump sum Site Clearing and Grubbing 900 m3 Topsoil and Subsoil Stripping 1000 m3 Topsoil and Subsoil Placement 3000 m2 Drill Seeding 1 lump sum Relocation of Existing Temporary Structures 1 lump sum Demolition of Existing Office Structure 1 lump sum Erosion and Sedimentation Control 30 m Demolition of Existing barbed Wire Fence 30 m Supply and Install of Barbed Wire Fence 1 lump sum Existing Stainless Steel Discharge Pipe 1 lump sum Removal of Existing CSP Culvert 2000 m3 Authorized Waste Excavation 750 m3 Authorized placement of Impervious Fill Zone 1A 15 m Supply and Install 300 mm CSP Culvert 35 m Supply and Install 500 mm CSP Culvert 2 each Supply and Install Pro-Eco-Lite Headwall 125 m3 Supply and Placement of Road Gravel Zone 4B 125 m3 Supply and Placement of Gravel Zone 4C 75 m Supply and Install 150 mm PVC 1 lump sum Supply and Install Stailess Steel Pipe and Fittings at Inlet Wall 125 m Supply and Install 250 mm PVC 25 m3 Supply and Placement of Coarse Riprap Bedding 5B 25 m3 Authorized Supply and Placement of Riprap Zone 6A 2 each Supply and Install Type 5A Precast Manhole 1 lump sum Division 3 - Concrete 1 lump sum Division 5 - Metals 1 lump sum Division 7 - Thermal And Moisture Protection 1 lump sum Division 8 - Openings 1 lump sum Division 9 - Finishes 1 lump sum Division 11 - Crane 1 lump sum Division 11 - Equipment 1 lump sum Division 13 - Special Construction 1 lump sum Division 13 - Steel Building Systems 1 lump sum Division 15 - Mechanical 1 lump sum Division 16 - Electrical Contractor to supply all materials.

Award

Water / Sewer

$3,706,495.00

Public - State/Provincial

Site Work

109

33

59

6

Subscribe For Documents

93 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
54
Bidding Soon
692
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2026

April 1, 2026

Project location map

AB-20, Bluffton, AB

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed