BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 7, 2026 at 7:00 PM

Updated February 8, 2026

Site work for a water / sewer project in Gwynn, Virginia. Working plans call for site work for a water / sewer project.

Date Correction: The Virtual Industry Day will be held on 15 January 2026. Milford Haven Dredging and Jetty Repair Special Announcement: Industry Day The U.S. Army Corps of Engineers (USACE), Norfolk District (NAO) is hosting a VIRTUAL Industry Day event on 15 January 2026, from 1:00 p.m. to 3:00 p.m. (EST) for dredging industry contractors interested in the future Milford Haven Dredging and Jetty Repair contract. Pre-registration is required for this VIRTUAL event. Please RSVP by Monday, 12 January 2026 by providing your name, company, relation to the dredging industry, and email address via email to Contract Specialist, Susan Ellis at susan.k.ellis@usace.army.mil. A virtual calendar invite will be sent to registered participants prior to the event. There is no solicitation at this time. The event is neither a marketing opportunity for businesses, nor will it promote upcoming projects. The project consists of hydraulic maintenance or mechanical dredging of Milford Haven Channel, transporting dredged material by pipeline for placement within designated beach sites, performing minor site work at the placement areas, and restoring the adjacent jetty structure. Dredging will cover a portion of the authorized channel to a depth of -10 feet mean lower low water (MLLW), including 1 foot of allowable overdepth. Jetty repair will involve removing old stone, installing sheet piles, and placing new stone. Draft drawings and specifications have been provided for industry feedback, and the final solicitation is anticipated in the fourth quarter of FY2028. **Location:** Milford Haven Federal Navigation Channel, Gwynn, Virginia. Work estimated between $100,000 and $5,000,000. Periods of Performance Jobs in excess of 24 months are to be weighted at .12. Jobs of lesser duration are to be proportionately weighted to a minimum of .03 for jobs not to exceed 30 days. No weight where additional time not required. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Water / Sewer

$5,000,000.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
214
Active Projects
77
Bidding Soon
1,505
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

Project location map

To Be Determined, Gwynn, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.