BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Chicago, Illinois. Completed plans call for site work for a water / sewer project.

The district is seeking proposals for the rebuilding of the Dewatering Facility at the Calumet Water Reclamation Plant (WRP) located at 400 East 130th Street, Chicago, IL 60628. Proposals are sought from qualified Proposers to design, install and rebuild the centrifuge Dewatering Facility on a Progressive Design-Build (PDB) basis. The following is a list of major items in the scope of work. Refer to APPENDIX R - DESIGN CRITERIA DOCUMENT for a detailed scope of work, specifications, and reference drawings from previous contracts. Replacement of six (6) centrifuges and all related process, mechanical, electrical, and I&C systems in the facility to enable the operation of the new dewatering equipment; replacement of boilers; and rehabilitation of conveyor systems. The design shall be in compliance with the current National Fire Protection Association (NFPA) codes. Construction of two (2) digested sludge storage tanks, each with a 0.75-million-gallon capacity, near the Dewatering Building to allow normal digester operations while the centrifuge facility is off-line. Structural and architectural inspection and rehabilitation of the facility building, including wall modifications to meet the NFPA code requirements. Civil site work as required for access roads, pavements, grading and drainage, and underground piping and utilities. Rehabilitation of heating, ventilation and air conditioning systems as well as all plumbing work in the building. Installation of a new diesel fuel tank, pump, and dispenser at the West Drying Cells. Installation of a new Ferric Chloride storage and conveyance system near the new digested sludge storage tanks. Correction of any additional issues or deficiencies identified during the detailed facility inspection/investigation.\ Important Note for Diverse Bidders, Including but Not Limited to MBE/WBE/DBE/VBE/SBE Bidders: By submitting a bid to F.H. Paschen, Diverse Bidder certifies that it has prepared its own proposal, including but not limited to, price, inclusions, exclusions, and qualifications. The contract’s FINAL COMPLETION date of October 13, 2028

Post-Bid

Water / Sewer

$71,500,000.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

141 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
504
Active Projects
330
Bidding Soon
4,371
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2026

December 23, 2026

Project location map

400 E 130th St, Chicago, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.