Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 9, 2026 at 8:00 PM
Updated June 11, 2026
Site work and paving for a road / highway in Bonita Springs, Florida. Conceptual plans call for site work for a road / highway.
This project is under FPIDs: 435347-1 and 435110-1. Old 41 (County Road 887) is currently an undivided two-lane roadway, that also includes a center turn lane at various points within the study area. It is classified as a major urban collector that provides access to a number of residential subdivisions and industrial parks along the project corridor. It is also an important facility for commuters and freight traffic as an access point from US 41/Tamiami Trail and Bonita Beach Road to major transportation facilities, including Interstate 75. The goal of this Project Development and Environment (PD&E) study is to evaluate and document potential engineering and environmental effects of any proposed improvements needed to relieve existing congestion and accommodate future travel demand from projected population and employment growth in the area. Improvements may include the potential widening of the roadway up to four lanes, as well as safety considerations for bicyclists and pedestrians, such as marked bicycle lanes, sidewalks, and/or a shared-use path. FDOT is conducting this PD&E study in accordance with the requirements of the National Environmental Policy Act (NEPA) and other federal and state laws and regulations. This project (although under one study) has two segments due to part of the project being located in Collier County and part of the project being located in Lee County. The first segment, in Collier County, is from US 41/Tamiami Trail to the Lee County Line. The second segment, in Lee County, is from the Collier County Line to Bonita Beach Road. As of June 9, 2026, this project is still in the project development and environment study phase. A timeline for design and construction has not been established yet.
Conceptual
Roads / Highways
$83,000,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2027
Old 41 Rd, Bonita Springs, FL
Related To This Project
Bonita Springs, FL
Bid Date: Jun 11 2026
Bonita Springs, FL
Bid Date: Jun 16 2026
Bonita Springs, FL
Bid Date: Jun 19 2026
Bonita Springs, FL
Bid Date: Jul 07 2026
Bonita Springs, FL
--
Bonita Springs, FL
Bid Date: Apr 17 2026
Bonita Springs, FL
Bid Date: May 18 2026
Bonita Springs, FL
Bid Date: May 04 2026
Bonita Springs, FL
--
Bonita Springs, FL
Bid Date: Jun 04 2026
Bonita Springs, FL
Bid Date: May 13 2026
Bonita Springs, FL
Bid Date: Mar 17 2026
Bonita Springs, FL
Bid Date: Mar 12 2026
Bonita Springs, FL
Bid Date: Mar 03 2026
Bonita Springs, FL
Bid Date: Apr 09 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
