Published March 5, 2026 at 7:00 PM
Updated March 6, 2026
Site work and new construction of a water / sewer project in Sandy Point, Texas. Completed plans call for site work for a water / sewer project; and for the construction of a water / sewer project.
Scope of Work of the Contract Documents includes Construction of Wynserra Wastewater Treatment Plant - Phase 1 (0.1 MGD). The deadline to ask questions is 2/09/2026 10:00 AM CST Bidders desiring further information or further interpretation of any part of the Contract Documents are hereby obligated to submit a written request online Site Location The proposed facilities is located approximately 3,800 feet southeast of the intersection of FM 521 and Sandy Point Rd. (Brazoria County Key Map 727 - F) The site work contractor is responsible for all site work, including but not limited to construction of an eight-foot (8') wooden fence; ; yard piping, influent piping; effluent piping and outfall; manholes; site work; storm piping and outfall; crushed concrete roads and IWTP pad; protective coatings, concrete pads; swales; inlet; new electrical service; service entrance equipment; installation of natural gas generator supplied by Owner, installation of automatic transfer switch supplied by Owner; 480V distribution panelboard; 120/240V panelboard; transformer; lighting contactor panel; autodialer; SPD; site lighting; electrical rack and supports; electrical manholes; underground duct banks with wires and conduits; terminal boxes at Digester No. 2; wires and conduits from the terminal boxes at Digester No. 2 to the electrical rack; installation of the PLC panel at the rack; lift station control panel; grounding; bollards; site grading; all associated electrical and site work; facility start-up in its entirety; and all else specified and shown in the construction documents, complete in place for a fully functioning plant. The 100,000 gallon per day interim package wastewater treatment plant facilities shall include delivery and assembly of the facilities with all accessories and equipment; including aeration basin; multi-stage digester units; final clarifier; chlorine contact basin; non-potable water system; sodium hypochlorite disinfection equipment and disinfection equipment building; eyewash and safety shower with canopy; walkways, bridges, and handrails; air diffusion equipment; air lifts; flow measurement equipment and PLC control panel; blowers; aboveground interconnecting piping, valves, fittings, supports; hose bibbs; control panels for equipment including the blowers, clarifier, non-potable water system, disinfection equipment and effluent flow measurement; basin lightings, and all other electrical plant devices; and electrical wiring (including wiring to the terminal boxes at Digester No. 2); and all accessories, equipment, piping, etc. within the plant, complete as specified. Within the package plant scope is all the plant related functions from the stub up for the force main piping upstream of the manual bar screen and the stub up for the effluent piping downstream of the chlorine contact basin; and everything in between. The installation of the package plant facilities shall be the responsibility of the package plant vendor. Installation includes all delivery, installation and start-up. The site work contractor shall coordinate with the package plant vendor for all connections and slab dimensions. At the package plant facilities, the site work contractor is responsible for all site work shown in the construction drawings including all work not associated with the package plant facilities. However, the site work contractor is responsible for concrete slabs and pads, and all buried piping located within the limits of the proposed package plant facilities. All buried piping shall be installed with a flanged stub-up approximately 12-inches (12") above finished grade at all locations. The site work contractor is responsible for any underground duct banks and underground conduit between local control panels supplied by the package plant vendor and field equipment supplied by the package plant vendor unless stated otherwise on the plans. The package plant vendor is responsible for all wiring between the local control panels supplied by the package plant vendor and field equipment supplied by the package plant vendor. The package plant vendor is also responsible for all above ground conduit between the local control panels supplied by the package plant vendor and field equipment supplied by the package plant vendor unless stated otherwise on the plans. The site work contractor is responsible for coordination with package plant vendor firm to coordinate pipe and electrical connections, buried pipe locations, deliveries and schedules. Each Bid must be accompanied by a Bid bond or a certified or cashier's check, acceptable to the Owner, in an amount not less than two percent (2%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract Documents and execute the Bonds on the forms provided and provide the required insurance certificates and Bonds within seven (7) days after the date Contract Documents are received by the successful bidder. If a certified or cashier's check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashier's check within one (1) business day of receipt of the bid opening. Pre-Bid Date & Time: Wednesday, January 7, 2026 10:00 a.m. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except the time forsubmitting a Bid. The successful bidder, if any, will be the responsible bidder, which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and the bidder agrees that the Contract Documents can be terminated if the bidder knowingly or intentionally fails to comply with a requirement of that subchapter Name and Location of Project. Work covered by these Technical Specifications is entitled iConstruction of Wynserra Wastewater Treatment Plant - Phase 1 (0.1 MGD) for Brazoria County Municipal Utility District No. 90, Brazoria County, Texas.i 2. Description of Work. a. Under this Contract, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in these Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be reasonably implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and Contractor shall deliver the installation to Owner in operating condition. b. The Work, in general, under this Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. Major items of construction and services required are designated as follows: 1) Construction of Wynserra Wastewater Treatment Plant - Phase 1 (0.1 MGD). QA deadline changed to 02/17/2026 as per website.
Bid Results
Water / Sewer
$3,757,319.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 20, 2026
April 21, 2026
Sandy Point Rd & FM 521 Rd, Sandy Point, TX
Related To This Project
Sandy Point, TX
--
Sandy Point, TX
Bid Date: Mar 31 2026
Sandy Point, TX
--
Sandy Point, TX
--
Houston, TX
Bid Date: Jan 20 2026
Fort Worth, TX
--
Lackland AFB, TX
Bid Date: Feb 04 2026
Rockwall, TX
Bid Date: Jan 20 2026
Burleson, TX
Bid Date: Jan 15 2026
Austin, TX
--
Plano, TX
Bid Date: Jan 27 2026
Synthetic Four-Lane Running Track & Fence Additions at Rice & Schimelpfenig Middle Schools - 5990471
Plano, TX
Bid Date: Feb 03 2026
Plano, TX
Bid Date: Feb 10 2026
Weatherford, TX
Bid Date: Jan 09 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.