BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 22, 2026 at 7:00 PM

Updated January 23, 2026

Site work for a civil project in Aubrey, Texas. Completed plans call for site work for a water / sewer project; and development.

The Project includes: removing, hauling, and disposing of up to approximately 6,200 dry tons of water treatment residual solids. Question Deadline 01/15/2026 at 10:00 AM CT Questions must be posted to online prior to the bid opening in accordance with the Instructions to Bidders. All questions about the meaning or intent of the Contract Documents shall be submitted to the ENGINEER in writing. Replies will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER as having received the Contract Documents. Questions received less than five (5) working days prior to the date for opening of Bids may not be answered. Bidders must submit a cashier's check, or acceptable bidder's bond with their proposal payable to Upper Trinity Regional Water District in an amount not less than of five percent (5%) of the bid submitted. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Owner reserves the right to adopt the most advantageous interpretation of the bids submitted in the case of ambiguity or lack of clearness in stating proposal prices, reject any or all Bids or parts of Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids, and/or waive formalities. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work. The Work, under this Contract, consists of furnishing all labor, supervision, equipment, tools, materials, transportation, services, and related items necessary for the removal and disposal of residual solids. 1. The Work includes, but not necessarily limited to, the following: a. Removal and disposal of residual solids and pumped water from recovery ponds to the lines and grades of the ponds shown on the drawings. b. Removal of any debris or aquatic vegetation such as reeds or cattails. 2. Unless otherwise specified, CONTRACTOR shall provide the following: a. Temporary facilities and controls as specified in Division 1 Section 01400 "Contractor Requirements." b. Provide quality control, material testing, field-testing, and related services in accordance with Division 1 Section 01400 "Contractor Requirements." c. Provide quality assurance and control services in accordance with Division 1 Section 01400 "Contractor Requirements." OWNER provided quality assurance and quality control services would be an overview of the Work during construction. d. Field surveying required for support of construction operations. e. Applicable permits, licenses and jurisdictional inspections, certificate of occupancy, and related work as necessary for OWNER to assume operation of facility. Custom Bid Results Bid Proposal A Stage 3 Separation, LLC - 2,082,500.00 Bid Proposal Bid Stage 3 Separation, LLC - 1,581,900.00

Bid Results

Water / Sewer

$3,664,400.00

Public - County

Site Work

11

20

2

5

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
3
Bidding Soon
2,582
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2026

February 19, 2026

Project location map

11500 Fishtrap Rd, Aubrey, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.