BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 14, 2026 at 7:00 PM

Updated January 30, 2026

Renovation of a clubhouse / community center in Paterson, New Jersey. Completed plans call for the renovation of a 30,000-square-foot clubhouse / community center.

Work to be performed as part of the Base Bid shall consist of the gut rehabilitation of a 30,000+ square foot building with all related carpentry, masonry, mechanical, electrical, plumbing, utility, lighting, and site improvements, and other work necessary to complete all Base Bid improvements shown on the project plans. Work to be performed as a part of Alternate Bid shall consist of construction of various building features, all related carpentry, masonry, mechanical, electrical, plumbing, utility, lighting, and site improvements, and other work necessary to complete all Alternate Bid improvements shown on the project plans. Bids must be submitted on the standard Proposal Form provided by NJCDC in the manner designated, and must be enclosed in a sealed envelope bearing the title of the bid, name and address of the bidder on the outside, addressed to NJCDC Director of Real Estate, and delivered to 32 Spruce Street, Paterson, NJ prior to the date and time of the bid opening. All documents contained in this package must be returned to NJCDC in their original form. No substitutions, alterations, or modifications of any of the bid documents are permitted. A bid guarantee in the amount of 10% of the bid, but not in excess of $20,000.00, will be required, and may be given by certified check, cashier's check or bid bond. Because federal funds are being used, contractors must comply with the Federal Rider incorporating the Uniform Guidance requirements (2 C.F.R. Part 200), including domestic preference, SAM.gov debarment verification, and required federal contract clauses. All Federal Prevailing Wage Regulations and Federal Labor Standards apply. Contractors must keep all project-related records for at least five years after project closeout. Contractors must also ensure that all subcontractors at every tier comply with the same requirements. New Jersey Community Development Corporation reserves the right to consider bids for sixty days after receipt and reserves the right to waive minor immaterial formalities or to reject any or all proposals in accordance with applicable law. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq and N.J.A.C. 17:27 et seq.

Post-Bid

Clubhouse / Community Centers

$8,000,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2026

March 15, 2026

Project location map

59 Spruce Street, Paterson, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.