BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2026 at 7:00 PM

Updated March 4, 2026

Site work and paving for a mixed-use development in Yorkville, Illinois. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

https://www.shawlocal.com/kendall-county-now/2026/02/26/yorkville-oks-567-million-in-water-main-replacements-and-road-work/ Yorkville is beginning its third straight year of “aggressively” replacing water mains throughout the city. The 2026 Water Main Improvements project contains more work than typical years as the city gears up to reach requirements for the $224.4 million Lake Michigan water project. Around $179.5 million of those costs are being covered through Illinois Environmental Protection Agency (IEPA) loans. The loans require the city to reduce water loss from things like water main breaks, pipe leaks and water inefficiencies. Public Works director Eric Dhuse said the city is continuing to replace older, cast iron water mains that are prone to breaks and leaks. The City Council approved a $5,258,408 contract for the work with Winninger Excavating, Inc, of Naperville. The council also approved $419,495 for engineering services with Engineering Enterprises, Inc, of Sugar Grove. The city is applying to receive loan funding through the IEPA’s Public Water Supply Loan Program, according to city documents. Locations for the work The project is a combination of water infrastructure work and road work. During the project, crews are replacing the water main that runs along Illinois Route 47 to the Penny Lane Apartments. The newly installed water main will be tied into Colonial Parkway. Workers are also replacing water mains along Illini Drive, Walter Street, Olsen Street, East Ridge Street. A rear yard water main is being replaced near the Countryside subdivision. Water main replacement along Adrian Street, Blaine Street, and State Street is being pushed back until the 2028 construction season, when other nearby streets in that area are slated to undergo water main construction. In total, the 2026 project involves installing around 10,140 feet of ductile iron water main. Road work included in the project involves curb and gutter removal and replacement, sidewalk removal and replacement, and roadway resurfacing. Roadway improvements are being undertaken along Naden Court, Blackberry Lane, Dickson Court, Palmer Court, Countryside Parkway, East Ridge Street and Fox Road. Crews will also be working along Washington Street, Olsen Street, Walter Street, Illinois Drive and Mill Street. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ February 24th- Contract Intent to Award by the United City of Yorkville Mid June: Contract Award by City. Contractor receives the Contracts delivered for Execution, Bonding, and Insurance The scope of work consists of approximately 8,700 feet of 8-inch ductile iron water main, 2,300 feet of 12-inch ductile iron water main, all related appurtenances, curb and gutter removal and replacement, sidewalk removal and replacement, roadway resurfacing, and all other appurtenant work and materials necessary to complete the project as set forth in the Bid Documents. Question Deadline 02/03/2026 at 3:00 PM CT Questions regarding the bidding process, bidding software, bid package, or the scope of work should be addressed to Kyle Welte of Engineering Enterprises, Inc. at kwelte@eeiweb.com . A certified check or bank draft, payable to the order of The United City of Yorkville negotiable U.S. Government bond (at par value) or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to ten percent (10%) of the total Bid shall be submitted with each Bid. The successful bidder shall be required to furnish a satisfactory contract bond to the United City of Yorkville by a surety company authorized to do business in the State of Illinois covering the full amount of the contract. The successful bidder and all subcontractors shall be required to conform to the labor standards set forth in the Contract Documents. The successful bidder shall pay prevailing wage and shall provide certified payrolls to the City for the duration of the project. Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the Illinois Environmental Protection Agency (Illinois EPA). Neither the State of Illinois nor any of its departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. The procurement will be subject to regulations contained in the Procedures for Issuing Loans from the Public Water Supply Loan Program (35IAC Part 662), the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), Illinois Works Jobs Program Act (30 ILCS 559/20-1), and the "Use of American Iron and Steel" requirements as contained in Section 436 of H.R. 3547, the Consolidated Appropriations Act, 2014. Additionally, any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the United States Environmental Protection Agency (USEPA) and/or subject to the requirements of the Water Infrastructure Finance and Innovation Act (WIFIA). The procurement shall be subject to additional regulations specified within the contract documents. Attention is called to the fact that the project shall be exempt from the federal "Build America, Buy America Act" (BABA) requirements contained in the Infrastructure Investment and Jobs Act, Pub. L. No. 117-58, as per a BABA waiver being granted for the project by both USEPA and IEPA. This procurement is also subject to the loan recipient's policy regarding the increased use of disadvantaged business enterprises. The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. The policy is contained in the specifications. Bidders are also required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in 41 CFR 60- 4. The bidder shall submit, if requested by the City, a list of qualified references for projects of similar size and scope of this project. Proposals withdrawn may not be resubmitted at the same letting. Each bidder shall satisfy the City as to their ability, financially or otherwise, to carry out the work. The right is reserved to reject any or all bids or to waive technicalities and any informality in any bid. Bids may be held by the United City of Yorkville for a period not to exceed 150 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract. The United City of Yorkville is an equal-opportunity employer.

Award

Water / Sewer

$5,258,408.00

Public - City

Paving, Site Work

53

14

61

6

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
11
Bidding Soon
2,822
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2026

June 16, 2026

Project location map

Multiple Locations, Yorkville, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.