BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2026 at 7:00 PM

Updated January 23, 2026

Site work and paving for a civil project in Schenectady, New York. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Craig Street Pavement and Bridge Rehabilitation Question Deadline 01/16/2026 at 4:00 PM ET Questions regarding the Contract Documents should be directed to Brian Cooper either through email at bcooper@mjteam.com or by telephone at (518) 371-0799 x 409. Bidders shall promptly notify MJ Engineering, Architecture, Landscape Architecture, and Land Surveying, P.C. of any errors, omissions, conflicts or ambiguity within the Contract Documents within 14 days of bid opening. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to: This project includes the reconstruction of Craig Street from Forest Road to Albany Street, reconstruction of existing sidewalks, installation of a cycle track / multi-use path, traffic signal replacements and upgrades, drainage upgrades, lighting and ITS installations, landscaping, signing and striping, bridge deck modifications, and bridge rehabilitation General Scope of Work - Contractor: o On-site Work Zone Traffic Control (WZTC) during construction within 500 ft. of project, each end or to the limits required by WZTC standards. o Survey and layout of items in Contract o Full depth pavement reconstruction o Installation of ADA compliant cycle track, multi-use path, sidewalks, ramps, and crosswalks o New curb installation o Pavement striping o Pavement milling and overlay o Restoration of utilities o Lighting and electrical installation o Traffic signal replacements and improvements o Drainage installation and modifications o Landscaping o Guide railing and bridge barrier installation o Bridge deck modifications o Bridge superstructure and substructure rehabilitation There are no DBE goals for this project. There are no MBE/WBE/SDVOB goals for this project. The EEO Employment goals for this project are: 3.2% Minority Goal, 6.9% Women Goal

Post-Bid

Bridges / Tunnels

$400,000.00

Public - City

Paving, Site Work

230

10

134

4

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2026

February 20, 2026

Project location map

Craig St, Schenectady, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.