Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 21, 2026 at 7:00 PM
Updated January 23, 2026
Site work and paving for a civil project in Schenectady, New York. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
Craig Street Pavement and Bridge Rehabilitation Question Deadline 01/16/2026 at 4:00 PM ET Questions regarding the Contract Documents should be directed to Brian Cooper either through email at bcooper@mjteam.com or by telephone at (518) 371-0799 x 409. Bidders shall promptly notify MJ Engineering, Architecture, Landscape Architecture, and Land Surveying, P.C. of any errors, omissions, conflicts or ambiguity within the Contract Documents within 14 days of bid opening. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to: This project includes the reconstruction of Craig Street from Forest Road to Albany Street, reconstruction of existing sidewalks, installation of a cycle track / multi-use path, traffic signal replacements and upgrades, drainage upgrades, lighting and ITS installations, landscaping, signing and striping, bridge deck modifications, and bridge rehabilitation General Scope of Work - Contractor: o On-site Work Zone Traffic Control (WZTC) during construction within 500 ft. of project, each end or to the limits required by WZTC standards. o Survey and layout of items in Contract o Full depth pavement reconstruction o Installation of ADA compliant cycle track, multi-use path, sidewalks, ramps, and crosswalks o New curb installation o Pavement striping o Pavement milling and overlay o Restoration of utilities o Lighting and electrical installation o Traffic signal replacements and improvements o Drainage installation and modifications o Landscaping o Guide railing and bridge barrier installation o Bridge deck modifications o Bridge superstructure and substructure rehabilitation There are no DBE goals for this project. There are no MBE/WBE/SDVOB goals for this project. The EEO Employment goals for this project are: 3.2% Minority Goal, 6.9% Women Goal
Post-Bid
Bridges / Tunnels
$400,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 21, 2026
February 20, 2026
Craig St, Schenectady, NY
Related To This Project
Schenectady, NY
Bid Date: Feb 12 2026
Schenectady, NY
Bid Date: Jan 14 2026
Schenectady, NY
Bid Date: Feb 19 2026
Schenectady, NY
Bid Date: Jan 08 2026
Schenectady, NY
Bid Date: Jan 15 2026
Schenectady, NY
--
Schenectady, NY
Bid Date: Jan 29 2026
Schenectady, NY
Bid Date: Feb 19 2026
Schenectady, NY
Bid Date: Jan 13 2026
Schenectady, NY
Bid Date: Jan 13 2026
Schenectady, NY
Bid Date: Jan 14 2026
Schenectady, NY
Bid Date: Jan 15 2026
Schenectady, NY
Bid Date: Jan 09 2026
Schenectady, NY
--
Schenectady, NY
Bid Date: Jan 15 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
