BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 2, 2026 at 7:00 PM

Updated January 3, 2026

Site work and paving for a mixed-use development in Wentzville, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

1-70/Mar Le Drive Extension ($7,354,200): Mar Le Drive serves as the north outer road of Interstate 70 west of Church Street until it ends at Lodora Drive. This project would extend Mar Le Drive from Lodora Drive to West Pearce Boulevard. This new section of roadway would run beneath the railroad overpass, providing the downtown area with another grade-separated vehicular crossing and providing the only separated pedestrian crossing in the downtown area. This project would also provide a needed water main extension along Mar Le Drive. Although this is a City project, this roadway extension will be constructed as part of the State's Improve 1-70 project. The project is included in the City's 2026 Capital Improvement Program (CIP). As of January 2, 2026, per owner, this project will be incorporated into MoDOT's Improve I-70 project. Construction is ongoing and is scheduled to be complete in 2028. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Under Construction

Roads / Highways

$6,604,200.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
0
Bidding Soon
798
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 31, 2025

Project location map

Multiple Locations, Wentzville, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.