BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 26, 2026 at 7:00 PM

Updated January 27, 2026

Site work and paving for a road / highway in Paoli, Indiana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The proposed construction will include the installation HMA Overlay and all incidental work required, as specified in the Contract Documents and Provisions Security: Any person, firm or corporation who submits a proposal must file with their bid a certified check, bank draft, cashier's check or money order issued by a financial institution insured by an agency of the united states in the amount of five percent (5%), made payable to the treasurer of orange county. In lieu of the above, any person, firm or corporation who submits a proposal and has a principal place of business in the state of indiana may file with their proposal a bid bond in the amount of five percent (5%), made payable to the board of commissioners of orange county.Proposals may be held by the board of commissioners for a period not to exceed sixty (60) calendar days from the public opening. The successful contractor will be required to furnish a performance bond and payment bond in the amount of one hundred percent (100%) of the contract price, each, within ten (10) days after award of the contract and a two (2) year maintenance bond in the amount of thirty percent (30%) of the contract price prior to completion and final payment of the contract . The Board of Commissioners reserves the right to reject any proposal, to waive technicalities or irregularities therein, to delete any bid item or items and to award a contract on the proposal that in their judgment is most advantageous to Orange County. All questions concerning the letting of this project shall be submitted in writing to the Design Consultant (USI Consultants, Inc. Attention: Jodi Coblentz, 8415 E. 56th Street, Indianapolis, IN 46216, jcoblentz@usiconsultants.com) prior to 12:00 p.m. local time, January 14th, 2026

Bid Results

Roads / Highways

$1,087,944.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
0
Bidding Soon
584
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2026

February 20, 2026

Project location map

Multiple Locations, Paoli, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.