BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 26, 2026 at 7:00 PM

Updated January 27, 2026

Remodeling of an educational facility in Atlanta, Missouri. Completed plans call for the remodel of a educational facility.

Sealed bids are invited for the replacement of the high school gymnasium telescopic bleacher. Bids must be clearly marked and submitted by the specified deadline. There is one bid package for this project, and prospective contractors are highly encouraged to attend the pre-bid meeting. The owner reserves the right to reject any and all submittals or to advertise for new submittals if necessary. Scope The scope of work for this RFP is to complete the full demolition, haul off and disposal of the existing Atlanta C-3 High School gymnasium bleachers, and to furnish and install new manually operated, wall-mounted telescopic bleachers. The new telescopic bleachers will need to fit within the constraints of the existing building, including the existing steel columns. The bleachers shall include seven (7) rows, first-tier permanent and recoverable wheelchair cutouts, two rows of chairs and/or seat backs, molded high-strength polyethylene seat modules, closure panels, aisleways, aisle railings, and side railings (if required). See the bid documents for the technical specification and reference drawing. Owner referred to below is the Atlanta C-3 School District. The Contractor referred to below is the General Contractor. This bid package includes, but is not limited to, the following: 1. Technical specification construction services for Gymnasium Bleachers at Atlanta C-3 School District located at 600 S. Atterberry St., Atlanta, MO 63530. 2. Area of work shall be limited to the Gymnasium. 3. Any required engineering, permits and fees shall be the responsibility of the contractor. 4. General Contractor will be responsible for the demolition, haul-off, and disposal of the existing bleacher system, equipment, and accessories. 5. General Contractor is responsible for electrical work after the disconnects, including hooking up bleacher control box to power supply / disconnect. 6. The General Contractor shall be responsible for all required mounting, bracing and anchoring. 7. Protection of existing surfaces, including the gym floor and facilities, shall be the responsibility of the General Contractor. Any damage to existing surfaces (both interior and exterior) resulting from the General Contractor's work shall be the responsibility of the General Contractor to repair. Alternates must be pre-approved by the Owner in writing before RFP responses are submitted. To ask questions and any other pertinent submittal information please contact: Stacie McVey Email: smcvey@atlanta.k12.mo.us Questions will be accepted until 5:00 p.m. January 6, 2026; responses to questions will be provided via addendum by 5:00 p.m. January 8, 2026.

Bid Results

Educational

$108,989.00

Public - City

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
58
Bidding Soon
421
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2026

June 8, 2026

Project location map

600 S Atterberry St, Atlanta, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.