BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2026 at 7:00 PM

Updated January 24, 2026

Demolition, site work, renovation and addition to an educational facility in Saint Jo, Texas. Working plans call for the addition of a educational facility; for the demolition of a educational facility; and for the renovation of a educational facility.

Construction Manager at Risk Request for Proposals The Gordon ISD School Board is accepting Proposals from Building Contractors for Construction Manager-at-Risk for Additions and Renovations for Gordon ISD This project will consist of a new 7-lane track facility to be constructed at an existing athletic facility (Football Field and Track). The existing football (6-man) field will remain. Also remaining will be existing spectator seating (Home and Visitor), field lighting, scoreboard, goal posts, concession/restroom building, signage, rock walls, and a memorial/set of flagpoles. The existing play/time clocks will be relocated. The project will also include new concrete flatwork and paving, as necessary, to provide an accessible path of travel from new handicapped accessible parking area to the track (and associated field events), spectator seating, and the concession/restroom building Shortlist Confirmed.

Final Planning

Educational

$3,800,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
363
Active Projects
192
Bidding Soon
3,552
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2026

June 1, 2026

Project location map

206 W Evans St, Saint Jo, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.