BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2026 at 8:00 PM

Updated March 22, 2026

Demolition and site work for an educational facility in Las Vegas, Nevada. Completed plans call for the demolition of a educational facility; and for site work for a educational facility.

https://hoodline.com/2026/03/unlv-to-raze-historic-campus-side-church-keeps-corner-s-future-murky/ UNLV To Raze Historic Campus-Side Church, Keeps Corner’s Future Murky AI Assisted Icon By Amanda Williams Published on March 12, 2026 UNLV To Raze Historic Campus-Side Church, Keeps Corner’s Future Murky Source: Google Street View UNLV is preparing to tear down the former University United Methodist Church at 4412 S. Maryland Parkway, clearing a high-profile corner across from campus even though the university has not said what, if anything, will rise there next. The congregation decommissioned the midcentury sanctuary, moved services offsite, and left the fenced building vacant after selling the property last year. According to a Board of Regents agenda packet, the Nevada System of Higher Education’s Board of Regents authorized the acquisition in June 2025 to support long-term growth along the Maryland Parkway corridor. In a separate summary, UNLV described the purchase as a way to manage the campus footprint and preserve options for future development. Board materials and an attached appraisal put the land’s value at $10,920,000, with UNLV setting an acquisition cap of up to $11.2 million to cover the purchase and closing costs, according to the Board of Regents. The site is listed as roughly 4.01 net acres at the northeast corner of Maryland Parkway and University Avenue, directly across from the university. Fire Damage And A Quiet Shell The Las Vegas Review-Journal reported that a June 4, 2025 rooftop fire left parts of the church burned and triggered an arson investigation. Months of vacancy after the blaze turned the sanctuary into a quiet shell and helped drive the congregation’s decision to formally decommission the building. Demolition Timeline And What UNLV Is Saying As first reported by 8 News Now, UNLV expects to demolish the former church sometime this month. David Frommer, the university’s vice president of planning and real estate, told the station that UNLV has not identified a specific project for the parcel and views the acquisition as a way to preserve future options. Church leaders held a final service in December 2025 before decommissioning the sanctuary and say they are raising money to build a new church in the southwest valley while meeting at a nearby Methodist congregation. Pastor Stephen Govett described congregations as “always in transition,” a polite way of saying this particular flock is worshipping elsewhere for the foreseeable future. What It Means For UNLV And The Neighborhood According to UNLV, the purchase aligns with the Maryland Campus Master Plan and gives the university control of a key parcel along Maryland Parkway. Officials say holding the land provides flexibility for future program needs, even if construction is not on the immediate horizon. Neighbors and former parishioners are likely to watch the teardown closely as UNLV navigates the line between campus growth and neighborhood character. The university says it will oversee demolition work, while the congregation focuses on fundraising and plans for a new home elsewhere in the valley. --------------------------------------------------------- LAST DAY FOR QUESTIONS: Thursday, January 22, 2026 12:00 AM PST Please submit any questions or requests for additional information through the NGEM question tab. All correspondence should note the IFB number in the subject line. Frances Heiy, Senior Purchasing Analyst frances.heiy@unlv.edu with copy to purchasingunlv@unlv.edu 702-450-1263 or 702-895-3521 The project scope consists of the asbestos abatement of all structures, per recommendations on the asbestos survey report # 20236689V50 enclosed ("UNLV Methodist Church ACM Survey.pdf"), and the demolition of all structures on the 4412 South Maryland Parkway property, including inner fences and gates, and subterranean items. Exceptions: Two (2) light poles located at opposite ends of the property (marked on the floor plan), that will only have the copper removed from them. These poles will be used by our Police Services to support 360- degree cameras. These cameras will be provided and installed by Police Services. Also, all the parking lot curbs and asphalt are to remain, to allow for a potential future use as a temporary parking lot. All utilities are to be terminated and lines capped at the edges of the property. All underground lines into the property are to be removed. Exposed trenches are to be infilled with compressed soil. Work to be coordinated with the utility companies. There is a grease interceptor just west of the multipurpose building. This interceptor is to be completely removed and the pit cleaned, before it being infilled with existing soil, following UPC guidelines. The height discrepancy between the current multipurpose building's pad and the level of the parking lot south of it (a drop of about two or three feet) should be gradually leveled, using earth removed from other locations on the site, to ease the drop, while attempting to preserve the parking lot stalls and driveway. All landscaping is to be removed, including the gravel currently located in these landscaped areas. Question Deadline 01/22/2026 at 12:00 AM PT

Post-Bid

Educational

$600,000.00

Public - State/Provincial

Demolition, Site Work

15

10

23

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2026

March 9, 2026

Project location map

4412 S Maryland Pkwy, Las Vegas, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.