BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 22, 2026 at 7:00 PM

Updated January 30, 2026

Site work for a power facility in College Station, Texas. Completed plans call for site work for a power facility.

The Post Oak Substation Yard Expansion project is located at 807 Holleman Drive East, College Station, TX 77840. This project involves the installation of structural and electrical equipment necessary to support the construction and operation of a fully functional electrical substationThe scope of work includes providing all required materials, labor, and construction equipment for the successful completion of the substation as outlined in the project specifications and contract documents. The contractor is responsible for ensuring that all specified work is completed to meet the operational and safety standards set forth by the owner. Question Deadline 01/22/2026 at 2:00 PM CT Questions and inquiries about this RFP should be submitted in writing via the Q&A feature available through online. The scope of work includes providing all required materials, labor, and construction equipment for the successful completion of the substation as outlined in the project specifications and contract documents. The contractor is responsible for ensuring that all specified work is completed to meet the operational and safety standards set forth by the owner. The City has determined that 180 calendar days from the Notice to Proceed to Substantial Completion (and additional 30 to Final Completion) should be sufficient time for performing all work. Coordination with the Owner and other contractors working on-site is a critical component of this project. While the contract documents are intended to illustrate the overall requirements, the contractor is expected to bring specialized knowledge in substation construction and proactively address any minor discrepancies or omissions in the plans. Such minor issues shall not constitute grounds for change orders, as the primary goal is the delivery of a fully functional and operational facility. Bid Security shall be in effect from the opening of the Proposal and will be retained until an Offeror has executed the Construction Agreement and furnished the required contract security or more than ninety (90) calendar days from the date of opening of the Proposal have lapsed. All Proposals are irrevocable and cannot be withdrawn for ninety (90) day calendars following the date scheduled for the opening of the Proposals. Owner reserves the right to reject any and all Proposals, to waive any and all informalities and irregularities and to negotiate contract terms with the Successful Offeror, and the right to disregard all non-conforming, non-responsive, unbalanced or conditional Proposals. Also, Owner reserves the right to reject the Proposal of any Offeror if Owner believes that it would not be in the best interest of the Project to make an award to that Offeror, whether because the Proposal is not responsive or the Offeror is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by Owner. Discrepancies in the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. The City has established $1,400,000.00 The City has determined that 180 calendar days from the Notice to Proceed to Substantial Completion (and additional 30 to Final Completion) should be sufficient time for performing all work. PROJECT #: CSB-24

Post-Bid

Power Plant

$1,400,000.00

Public - City

Site Work

49

12

4

2

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
3
Bidding Soon
2,199
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2026

March 30, 2026

Project location map

807 Holleman Dr E, College Station, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.