BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 29, 2025 at 7:00 PM

Updated December 30, 2025

Site work and paving for a mixed-use development in Rochester Hills, Michigan. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The vinyl fence that runs along the Livernois retaining walls (portions from Avon Rd. north to New Life Ln. - app. 3,300 feet total) has damaged portions for which materials can no longer be procured. The fence is over 20 years old, regularly sustains damage from storms, and needs to be replaced. Brown Trex fencing, matching the material used in the Auburn Corridor, is a common, easy to maintain option which should not present the same availability issue. The project is included in the City's 2026-2031 Capital Improvement Program (CIP). As of December 30,2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Sidewalks / Parking Lot

$685,600.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
408
Active Projects
191
Bidding Soon
2,292
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2029

Project location map

E Avon Rd, Rochester Hills, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.