BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 9, 2026 at 7:00 PM

Updated February 10, 2026

Site work and paving for a mixed-use development in Plainfield, Indiana. Completed plans call for site work for a road / highway; sidewalk / parking lot; bridge / tunnel; for paving for a road / highway; bridge / tunnel; sidewalk / parking lot; and water / sewer project.

As of 01/09/2026 per Civil - • No pre-bid meeting will be held on Wednesday, 1/14 as previously indicated. It will be rescheduled. • The Town has elected to delay the bid opening date scheduled for 1/26. Additional information will be provided. The Project includes the following Work: The Project will develop a two-way roadway with a multi-use path from a tie in at Section Street on the west end to a tie in with the Quaker Boulevard/Stout Heritage Parkway intersection on the east end. The roadway will run on the north side of Brentwood and Clarks Creek Elementary Schools for approximately 0.44 miles. The project will also require the construction of a bridge to cross Clarks Creek. The bridge will be approximately 123 ft. CL to CL of end bents (120 ft. clear span). The construction of the bridge spanning Clarks Creek will require relocation of the stream channel approximately 120 ft. to the east. The proposed new channel will be straightened through the bridge opening. There will be some modifications to school parking lots to work with the new roadway alignment and infrastructure. Storm sewer infrastructure will be added for drainage and the existing storm sewer will be modified as necessary. The intersection connection to Quaker Blvd will require turn lane modifications and signal modifications. Lighting will be added and modified along the corridor. Miscellaneous related work includes, but is not limited to: clearing, tree removal, maintenance of traffic, erosion control, pavement markings, signage, lighting, signal modifications, tree plantings, landscaping, curb ramps, sidewalks, and other work listed in the itemized proposal and as shown on the plans. Each bid shall be accompanied by an acceptable certified check made payable to the Town of Plainfield or an acceptable bid bond in the amount equal to 10% of the total bid price executed by an incorporated surety company in good standing and qualified to do business in the State of Indiana and whose name appears on the current Treasury Department Circular 570. A Performance Bond and Payment Bond each in the amount of 100% of the Contract price will be required from the Contractor to whom the work is awarded. Doc note: Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. A printed version of the Bidding Documents shall be made available for review at the Plainfield Clerk's Office. Question Deadline 01/21/2026: All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than five (5) days prior to the date for opening of Bids may not be answered.

GC Bidding

Roads / Highways

$4,000,000.00

Public - City

Paving, Site Work

149

13

105

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
100
Bidding Soon
1,074
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2026

April 24, 2026

Project location map

Craig St & Stevens Dr, Plainfield, IN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.