Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 8, 2026 at 7:00 PM
Updated January 9, 2026
Site work and renovation of a water / sewer project in Dearborn, Michigan. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
GLWA has initiated a Project to conduct numerous improvements to the Hubbell-Southfield Combined Sewer Overflow (CSO) Facility located in Dearborn, Michigan. Hubbell-Southfield has a 22-million-gallon (MG) storage capacity and a design flow capacity of 2,200 cubic feet per second (cfs). The facility began operation in 1999 and requires rehabilitation and upgrades to ensure continued reliable treatment of wet weather flows. The facility discharges to the GLWA Northwest Interceptor with overflows discharging to the Rouge River. This Project is focused on improving facility treatment reliability, flexibility, operation, maintenance, and safety features at the Hubbell-Southfield CSO Facility. This Project encompasses improvements to basin flushing, dewatering, disinfection, screening, instrumentation and controls, architectural/HVAC, and electrical, as well as site work and other items. A major upgrade is to replace the existing flushing system used to clean the basin with a more effective system. The scope of Work is described in Exhibit A of Attachment No. 1. Question Due Date/Time: Wednesday, January 28, 2026, 12:00 PM EST Contractor shall conduct numerous improvements to the Hubbell-Southfield Combined Sewer Overflow (CSO) Facility located in Dearborn, Michigan. Hubbell-Southfield has a 22-million-gallon (MG) storage capacity and a design flow capacity of 2,200 cfs. The facility began operation in 1999 and requires rehabilitation and upgrades to ensure continued reliable treatment of wet weather flows. The facility discharges to the Northwest Interceptor with overflows discharging to the Rouge River. This project is focused on improving facility treatment reliability, flexibility, operation, maintenance, and safety features at the Hubbell Southfield CSO Facility. This project encompasses improvements to basin flushing, dewatering, disinfection, screening, instrumentation and controls, architectural/HVAC, and electrical, as well as site work and other items. A major upgrade is to replace the existing flushing system used to clean the basin with a more effective system.
GC Bidding
Water / Sewer
$20,000,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2026
June 15, 2026
Multiple Locations, Dearborn, MI
Related To This Project
Dearborn, MI
Bid Date: Jan 21 2026
Dearborn, MI
Bid Date: Feb 03 2026
Dearborn, MI
Bid Date: Jan 30 2026
Dearborn, MI
Bid Date: Jan 21 2026
Dearborn, MI
Bid Date: Jan 21 2026
Dearborn, MI
Bid Date: Dec 18 2025
Dearborn, MI
Bid Date: Jan 23 2026
Dearborn, MI
Bid Date: Jan 12 2026
Dearborn, MI
Bid Date: Feb 04 2026
Dearborn, MI
Bid Date: Dec 08 2025
Dearborn, MI
Bid Date: Dec 15 2025
Dearborn, MI
Bid Date: Nov 26 2025
Dearborn, MI
Bid Date: Dec 03 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
