BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 8, 2026 at 7:00 PM

Updated January 9, 2026

Site work and renovation of a water / sewer project in Dearborn, Michigan. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

GLWA has initiated a Project to conduct numerous improvements to the Hubbell-Southfield Combined Sewer Overflow (CSO) Facility located in Dearborn, Michigan. Hubbell-Southfield has a 22-million-gallon (MG) storage capacity and a design flow capacity of 2,200 cubic feet per second (cfs). The facility began operation in 1999 and requires rehabilitation and upgrades to ensure continued reliable treatment of wet weather flows. The facility discharges to the GLWA Northwest Interceptor with overflows discharging to the Rouge River. This Project is focused on improving facility treatment reliability, flexibility, operation, maintenance, and safety features at the Hubbell-Southfield CSO Facility. This Project encompasses improvements to basin flushing, dewatering, disinfection, screening, instrumentation and controls, architectural/HVAC, and electrical, as well as site work and other items. A major upgrade is to replace the existing flushing system used to clean the basin with a more effective system. The scope of Work is described in Exhibit A of Attachment No. 1. Question Due Date/Time: Wednesday, January 28, 2026, 12:00 PM EST Contractor shall conduct numerous improvements to the Hubbell-Southfield Combined Sewer Overflow (CSO) Facility located in Dearborn, Michigan. Hubbell-Southfield has a 22-million-gallon (MG) storage capacity and a design flow capacity of 2,200 cfs. The facility began operation in 1999 and requires rehabilitation and upgrades to ensure continued reliable treatment of wet weather flows. The facility discharges to the Northwest Interceptor with overflows discharging to the Rouge River. This project is focused on improving facility treatment reliability, flexibility, operation, maintenance, and safety features at the Hubbell Southfield CSO Facility. This project encompasses improvements to basin flushing, dewatering, disinfection, screening, instrumentation and controls, architectural/HVAC, and electrical, as well as site work and other items. A major upgrade is to replace the existing flushing system used to clean the basin with a more effective system.

GC Bidding

Water / Sewer

$20,000,000.00

Public - City

Renovation, Site Work

1308

33

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
472
Active Projects
240
Bidding Soon
2,595
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2026

June 15, 2026

Project location map

Multiple Locations, Dearborn, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.