BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 16, 2026 at 7:00 PM

Updated February 17, 2026

Renovation of a military facility in Springfield, Illinois. Completed plans call for the renovation of a military facility.

DCFT262001SourcesSought 183d Wing, Abraham Lincoln Capital Airport, Air National Guard Base, Springfield, IL 62707 Provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary to install a new vehicle exhaust ventilation system in Building 19 (B-19) at the 183d Wing, Illinois Air National Guard Base. The building was renovated in 2024 but lacks a proper exhaust system, and the new system must meet regulation requirements outlined in DAFMAN 91-203 (Air Force Occupational Safety, Fire, and Health Standards), paragraph 30.7.1.1, as well as all applicable codes and Department of the Air Force Instructions (DAFI). Work includes furnishing and installing all required components to provide a fully functional exhaust ventilation system. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Sub-Bidding

Military

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
171
Bidding Soon
1,122
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

March 30, 2026

Project location map

To Be Determined, Springfield, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.