Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 23, 2026 at 7:00 PM

Updated October 8, 2026

Renovation of a theater / auditorium in Santa Monica, California. Working plans call for the renovation of a 25,980-square-foot, two-story above grade theater / auditorium.

**As of February 23, 2026, bids received were rejected. No definite date for the rebid.** Replacement of the lobby windows and steel window supports above the east façade canopy at Barnum Hall, and replacement of door jambs below the canopy, and other. The scope of work for this project will consist of the removal of all identified building related hazardous materials which may be impacted by the upcoming demolition project planned at the Site. Pre-Bid Clarifications (Deadline) January 12, 2026 no later than Noon The dproject entails the replacement of the Barnum Hall Lobby façade windows. The replacement project will also include the removal of the existing door jambs, and replacing them with structural steel c-channels spanning fron ground level to ceiling height. The project accounts for two (2) allowances for replacement of the doors and hardware, and re-roofing of the canopy roof. The Hall shall remain operational during work hours. Description: Samohi Barnum Hall Windows Project This scope of work is estimated to be between $1,250,000.00 and $1,500,000.00 Prequalification Due Date & Instructions for Application Submission: All applications are due no later than 1/12/26 General Contractors and Mechanical, Electrical and Plumbing (M/E/P) Subcontractors must be pre-qualified for this project per bidding documents. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Theaters / Auditoriums

$1,500,000.00

Public - County

Renovation

44

17

12

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
604
Active Projects
212
Bidding Soon
4,332
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2026

August 24, 2026

Project location map

601 Pico Blvd, Santa Monica, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed