Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 19, 2026 at 7:00 PM
Updated February 20, 2026
Site work for a civil project in Braselton, Georgia. Completed plans call for site work for a water / sewer project; water / sewer project; and water / sewer project.
**As of February 18, 2026 this project has not yet been awarded. A timeline for the award has not yet been established.** The purpose of the project is to expand the groundwater system and prepare for a future interconnection with Barrow County. The project includes two new wells, a packaged treatment system, a 1-million-gallon ground level storage tank, high service pump station, 4,900 linear feet of 16” water main, and all system piping and appurtenances. Time of completion for all work associated with this project shall be three hundred (300) consecutive calendar days from the date of a written "Notice to Proceed" from OWNER. Each bid must be submitted in a sealed envelope addressed to the OWNER and plainly marked on the outside as, "2026 Ground Water Expansion and Storage for the Town of Braselton, Georgia." If the bid is forwarded by mail, the sealed envelope containing the Bid must be enclosed in a separate mailing envelope addressed to the OWNER at the designated address. Bids must be made out on the bid form bound in the Contract Documents, in accordance with the instructions in the Information for Bidders. No interlineation, additions, or deletions shall be made in the proposal form by the bidder. A bid bond or certified cashier's check in the amount of five percent (5%) of the total bid must be enclosed with the bid at the time of bid opening. The successful bidder will be required to furnish the OWNER with Insurance, Workman's Compensation Insurance, and Performance and Payment Bonds in the amount of one-hundred percent (100%) of the total bid. Surety and insurance companies must have a specified AM Best rating, be listed in the Federal Registry, and be licensed by the Georgia Insurance Department and Secretary of State. The successful bidder will be required to perform work as the Prime Contractor, with a minimum of 30% of the contract value performed by the Prime Contractor. Contractors and subcontractors must comply with all Federal, State, and local laws. Bidders must comply with specific requirements related to Equal Employment Opportunity (EEO) and the Byrd Anti-Lobbying Amendment. All State and Federal permits, as well as easements and rights of way, have been acquired by the OWNER. The OWNER reserves the right to waive informalities or to reject any or all Bids, and to accept any Bid deemed in the best interest of the OWNER.
Bid Results
Water / Sewer
$7,904,123.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 17, 2026
April 20, 2026
Charlie Smith Rd, Braselton, GA
Related To This Project
Braselton, GA
Bid Date: Nov 14 2025
Braselton, GA
Bid Date: Aug 13 2025
Braselton, GA
--
Braselton, GA
--
Braselton, GA
Bid Date: Jun 23 2025
Braselton, GA
Bid Date: Jul 01 2025
Braselton, GA
Bid Date: May 23 2025
Braselton, GA
Bid Date: Jun 04 2025
Braselton, GA
Bid Date: May 08 2025
Braselton, GA
Bid Date: Apr 09 2025
Braselton, GA
--
Braselton, GA
Bid Date: Feb 03 2025
Braselton, GA
Bid Date: Jan 29 2025
Braselton, GA
Bid Date: Nov 21 2024
Braselton, GA
Bid Date: Dec 04 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
