BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2026 at 8:00 PM

Updated May 22, 2026

Renovation of a mixed-use development in Fargo, North Dakota. Completed plans call for the renovation of a medical facility.

Contractor shall furnish all labor, materials, and equipment required to upgrade the domestic water monitoring systems across the Fargo VA Health Care System facilities to reduce or eliminate the risk of Legionella Disease. Work includes updating seven existing water monitoring stations and installing approximately 175 Thermostatic Mixing Valves or replacing existing sinks and faucet fixtures as specified in the contract documents. All work must be performed in accordance with the specifications, drawings, scope of work, and all other applicable contract requirements, with a performance period of 300 calendar days from notice to proceed. **Location:** Fargo VA Health Care System, 2101 Elm St N, Fargo, ND 58102 magnitude of construction cost range is between $1,000,000.00 and $2,000,000.00. Questions of a technical nature and inquiries concerning this solicitation must be provided in writing and shall be submitted by the prospective bidders to the Contract Specialist, Kaleb Gleason. Questions shall be submitted only via email to: kaleb.gleason@va.gov. The subject line must read: PN: 437-23-165, Repair Water System to Prevent Legionella Questions. Telephone inquiries will not be accepted. Questions, inquiries, or such are due no later than March 20, 2026, at 11:00 AM *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Purpose and Scope FourFront is committed to supporting the Fargo VA Health Care System in its efforts to reduce or eliminate the risk of Legionella Disease (LD) by upgrading the Domestic Water Monitoring Systems across its facilities. FourFront has conducted an on-site evaluation of the 7 existing water monitoring stations in the basement of the Medical Center and the lower level of the Boiler Plant. FourFront has also conducted on-site documentation and inventory of approximately 175 plumbing fixtures to determine the need for adding thermostatic mixing valves to existing fixtures or replacing existing faucets. Our goal is to provide design recommendations that will bring these systems up to optimum standards, focusing on preventing water contamination and ensuring the safety of both employees and patients. As part of a multi-step solution, the first step involves increasing the water temperature at the water heaters while lowering it at point-of-use fixtures. This will be achieved by installing thermostatic mixing valves to reduce temperature, effectively minimizing the risk of Legionella growth.

Post-Bid

Medical

$2,000,000.00

Public - Federal

Renovation

29

20

2

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2026

June 8, 2026

Project location map

2101 Elm St NE, Fargo, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.