Site work and paving for a road / highway in Fox Point, Wisconsin. Completed plans call for site work for a road / highway.
The work involves the reconstruction of North Beach Drive (Hill) and associated roadway and drainage improvements, including approximately 5,100 square yards of 4-inch asphalt mill and relay, removal of 87 reinforced concrete panels, installation of 1,650 linear feet of 24-inch concrete curb and gutter, placement of reinforced concrete panels (approximately 9'-11" x 2' x 4.5"), various types and quantities of hot-mix asphalt (HMA) pavement and sidewalk, installation of base aggregates and geotextiles, geogrid reinforcement, EPDM liner, common excavation and undercutting, landscaping restoration, traffic control measures, temporary signals, and temporary precast concrete barriers. Additional drainage improvements include inlet protection, removal and replacement of adjusting rings, installation of 4-foot diameter inlets, pipe underdrain installation, riprap, geotextile fabric, ditch regrading, and more. Bidders must submit proposals on the provided form, enclose them in a sealed envelope marked with the project name, and pay particular attention to bid signature requirements. A full and complete list of proposed subcontractors (including the class of work for each) must be submitted with the bid. A contractor’s qualification statement is also required unless previously submitted. Bids must include a bid bond or certified check of at least five percent of the bid, to serve as a guarantee upon acceptance. The selected contractor must furnish insurance certificates and payment and performance bonds in the full amount of the bid. No bids may be withdrawn for 150 days after opening without consent. The owner reserves the right to reject any or all bids, accept the most advantageous bid, or waive any technicalities. The project includes the following estimated quantities: N. BEACH DRIVE (HILL) - ROAD RECONSTRUCTION Mill and Relay 4" Asphalt Payment - 5,100 SY Removing Reinforced Concrete Panels - 87 EACH Concrete Curb and Gutter - 24-Inch - 1,650 LF Reinforced Concrete Panel - Approximately 9'-11" x 2' x 4.5" - 87 EACH HMA Pavement 3 LT 58-28 S and 4 LT 58-28 S- 870 TON HMA Pavement 4 LT 58-28 S - 580 TON HMA Sidewalk 5 LT 58-28 S (Single Layer) - 180 TON 3/4, 1 1/4 , 3-Inch Base Aggregate Dense, and Base Aggregate Open Graded - 6,850 TON Geotextile, Type DF Schedule A - 11,600 SY Geogrid Reinforcement, Type SR (Undistributed) - 3,900 SY EPDM Liner (45 Mil) - 450 SY Excavation Common - 2,950 CY Undercutting, EBS of Soft/Yielding Areas (Undistributed) - 1,100 CY Oral and other interpretations or clarifications will be without legal effect. However, Bidders wishing to discuss any aspect of this Work are requested to contact Mr. Yuriy Amelyan at (414) 751-7200 at the office of the Engineer (Kapur).
Bid Results
Roads / Highways
$1,048,385.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 29, 2026
July 1, 2026
N Beach Dr, Fox Point, WI
Related To This Project
Fox Point, WI
Bid Date: Dec 16 2025
Fox Point, WI
--
Fox Point, WI
Bid Date: Dec 16 2025
Fox Point, WI
Bid Date: Dec 16 2025
Fox Point, WI
Bid Date: Mar 20 2025
Fox Point, WI
Bid Date: Mar 27 2025
Fox Point, WI
--
Fox Point, WI
Bid Date: Jan 14 2025
Fox Point, WI
--
Fox Point, WI
Bid Date: Mar 26 2024
Fox Point, WI
--
Fox Point, WI
Bid Date: Mar 05 2024
Fox Point, WI
Bid Date: Feb 22 2024
Fox Point, WI
Bid Date: Jan 25 2024
Fox Point, WI
Bid Date: Jan 25 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.