BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 6, 2026 at 7:00 PM

Updated February 7, 2026

Site work, paving and new construction of a mixed-use development in Livermore, California. Conceptual plans call for the construction of a 6,000-square-foot, one-story above grade laboratory facility; for site work for a laboratory facility; road / highway; for paving for a road / highway; and water / sewer project.

Question Deadline 01/10/2026 Questions related to the information and/or requirements in this posting can be emailed to Nick Tevis at ntevis@sandia.gov or through the Business Opportunities Website (BOW) posting system. Questions shall be submitted no later than 72 hours before the close date of this posting. Questions submitted after this deadline may not be answered. NTESS reserves the right to subcontract for any, all, or none of the items or services with no penalty to either NTESS or the Offeror. Multiple subcontracts may be awarded as a result of the solicitation. National Technology & Engineering Solutions of Sandia (NTESS) managing Sandia National Laboratories, Livermore, California, has the need for subcontractors to perform construction services on two concurrent construction projects, Secure Weapons Interaction Center (SWIC ) and Western Utilities Corridor (WUC), at Sandia National Laboratory Livermore, CA (SNL/CA) on a firm fixed price basis. SWIC is a proposed one-story high security building of approximately 6,000 gross square feet that consists of one large, open high-bay section of about 4,000 sf with secured boundary constructed to current ICD/ICS 705 and Tempest/R-foil requirements, an adjoining wing of roughly 2,000 sf designed to current ICD/ICS 705 and Tempest/R-foil requirements. Site improvements include a receiving yard, security fencing surrounding the facility, access roadway/pathways and security gates. WUC is for the installation of a new utility corridor on the West side of the SNL/CA campus. The new utility corridor will comprise of potable water, sewer, storm, power, and communication lines. In total, the new utility corridor will be approximately 3,500 linear feet in length, include new sectionalizing switches, and provide further redundancy to the site's west side structures and programs. SWIC will need to be completed by January 2028 and WUC by September 2027.

Conceptual

Laboratories

$45,000,000.00

Public - Federal

New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2026

April 30, 2026

Project location map

Multiple Locations, Livermore, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.