Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 6, 2026 at 7:00 PM
Updated February 7, 2026
Renovation of a fire / police facility in Irvington, New York. Completed plans call for the renovation of a fire / police facility.
The Village of Irvington is soliciting proposals from qualified and experienced Construction Management firms to provide professional construction management services for the renovation and expansion of the Irvington Fire Department Headquarters, located at 90 Main Street, Irvington, New York. The Project will include building renovation, selective demolition, structural repairs, building system upgrades, firefighter health and safety improvements, and construction of new or reconfigured operational spaces. The Construction Manager will act as the Village's representative during pre-construction, bidding, construction, and closeout to ensure the Project is delivered on schedule, within budget, and in compliance with contract documents. The Irvington Fire Department operates from a headquarters facility that no longer meets current operational needs or best-practice safety standards. Although not limited to these items, the Scope of Work includes working with designated Village Architectural / Engineering (A/E) firms and/or Village staff. The CM is expected to address the following key elements: 1. The creation of a dedicated Firefighter Decontamination Area within the firehouse to reduce carcinogen exposure, improve post-incident hygiene, and support emerging best-practice standards (NFPA 1581, 1582, and 1851). The design provides firefighters with a functional, efficient, and safe workflow for on-scene and post-incident decontamination, turnout gear handling, and equipment cleaning. 2. Stabilization of the apparatus bay floor supporting Engine 178. The apparatus bay floor has shown signs of structural wear consistent with long-term loading, moisture migration, settlement, and concrete degradation. Given the critical operational role of Engine 178, the floor must remain structurally sound and capable of supporting heavy emergency apparatus without risk of failure or damage. All questions must be submitted in writing by: January 23, 2026 Questions shall be sent to: chessler@irvingtonny.gov
Post-Bid
Fire / Police
$140,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 30, 2026
June 1, 2026
90 Main St, Irvington, NY
Related To This Project
Irvington, NY
Bid Date: Jan 28 2026
Irvington, NY
Bid Date: Nov 19 2025
Irvington, NY
--
Irvington, NY
--
Irvington, NY
--
Irvington, NY
--
Irvington, NY
Bid Date: May 07 2025
Irvington, NY
Bid Date: Apr 16 2025
Irvington, NY
Bid Date: Jan 29 2025
Irvington, NY
--
Irvington, NY
Bid Date: May 01 2024
Irvington, NY
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
