BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2026 at 7:00 PM

Updated February 7, 2026

Renovation of a fire / police facility in Irvington, New York. Completed plans call for the renovation of a fire / police facility.

The Village of Irvington is soliciting proposals from qualified and experienced Construction Management firms to provide professional construction management services for the renovation and expansion of the Irvington Fire Department Headquarters, located at 90 Main Street, Irvington, New York. The Project will include building renovation, selective demolition, structural repairs, building system upgrades, firefighter health and safety improvements, and construction of new or reconfigured operational spaces. The Construction Manager will act as the Village's representative during pre-construction, bidding, construction, and closeout to ensure the Project is delivered on schedule, within budget, and in compliance with contract documents. The Irvington Fire Department operates from a headquarters facility that no longer meets current operational needs or best-practice safety standards. Although not limited to these items, the Scope of Work includes working with designated Village Architectural / Engineering (A/E) firms and/or Village staff. The CM is expected to address the following key elements: 1. The creation of a dedicated Firefighter Decontamination Area within the firehouse to reduce carcinogen exposure, improve post-incident hygiene, and support emerging best-practice standards (NFPA 1581, 1582, and 1851). The design provides firefighters with a functional, efficient, and safe workflow for on-scene and post-incident decontamination, turnout gear handling, and equipment cleaning. 2. Stabilization of the apparatus bay floor supporting Engine 178. The apparatus bay floor has shown signs of structural wear consistent with long-term loading, moisture migration, settlement, and concrete degradation. Given the critical operational role of Engine 178, the floor must remain structurally sound and capable of supporting heavy emergency apparatus without risk of failure or damage. All questions must be submitted in writing by: January 23, 2026 Questions shall be sent to: chessler@irvingtonny.gov

Post-Bid

Fire / Police

$140,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
283
Active Projects
20
Bidding Soon
4,398
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2026

June 1, 2026

Project location map

90 Main St, Irvington, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.