BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 22, 2026 at 7:00 PM

Updated January 23, 2026

Site work for a communication facility in Heppner, Oregon. Completed plans call for site work for a communication facility.

Morrow County is requesting proposals from qualified low-voltage contractors for fiber optic and data cabling work at the Morrow County Fairgrounds in Heppner, Oregon. The project includes installation of single-mode fiber, network racks, Ethernet cabling for future cameras, and an antenna mast. This is a public improvement project subject to Oregon Prevailing Wage Law. Morrow County is requesting bids from qualified and experienced low-voltage contractors for new fiber optic and data cabling work at the Morrow County Fairgrounds, located in Heppner, Oregon. Attached to this Request for Bid is a site diagram identifying the required fiber routes, network cabinet locations, future camera cable drops, and the antenna mast installation point. This project is grant funded. The grant expires on April 1, 2026, and all installation work must be fully completed on or before this date. Please note that internal administrative processes-including review, approval, and contract execution-must be completed prior to award, which further constrains the construction schedule. Even if your firm anticipates difficulty meeting the stated completion deadline, Morrow County still encourages submission of a bid. Additional funding may become available, or the grant timeline may be extended. If your firm is unable to meet the April 1, 2026 deadline, this must be clearly stated in your bid response. 1. Single-Mode Fiber Installation (Red on Diagram) Install twelve (12) strand single-mode fiber along the routes shown on the attached diagram. All inter-building fiber runs shall be aerial; existing poles are already in place. Terminate fiber inside each building's designated network cabinet (red squares). Fiber terminations shall utilize LC connectors into LC patch panels. Provide fiber testing results, labeling, and complete documentation.

Post-Bid

Communication

$200,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
27
Bidding Soon
225
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2026

February 11, 2026

Project location map

74473 OR-74, Heppner, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.