Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published March 24, 2026 at 8:00 PM
Updated March 25, 2026
Site work for a water / sewer project in Milford, New Hampshire. Completed plans call for site work for a water / sewer project.
As of March 24, 2026, this project has not yet been awarded. A timeline for the award has not yet been established. The Milford Water Utilities Department (Owner) is soliciting competitive sealed bids from qualified and competent local contractors for the replacement of aging municipal water main infrastructure. The project includes installation of new HDPE water main pipe, water valves and valve boxes, hydrants, water service connections, and associated appurtenances. Work also includes excavation, temporary trench support, dewatering, backfilling, compaction, surface restoration, and testing/disinfection. The work shall be executed in a manner that complies with the Town of Milford Water and Sewer Commission Water Utilities Standard Regulations and Specifications for Design and Construction of Water and Sewer Infrastructure, latest edition, and the New Hampshire Department of Environmental Services (NHDES) Drinking Water Standards. Project Duration Contractor shall substantially complete all work within 180 calendar days from issuance of the Notice to Proceed. Final completion of the water main replacement project shall be achieved no later than November 15, 2026. All questions shall be submitted in writing to the Owner's contact no later than seven days prior to the scheduled bid opening. A. This section covers the installation of High Density Polyethylene (HDPE) pipe and furnishing and installing HDPE fittings as shown on the Drawings and specified herein. B. Equipment required for butt fusion of HDPE pipe and fittings shall be furnished by the Contractor.
Bid Results
Water / Sewer
$825,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed