Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 12, 2026 at 8:00 PM

Updated September 18, 2026

Site work for a civil project in Milford, New Hampshire. Completed plans call for site work for a road / highway.

Traffic signal fiber optic cable installation on NH 33 from Target/Lowes to Borthwick Ave.; Traffic signal MA repair due to crash at FEET Exit 10 SB/Industrial Drive on NW corner (S-297-14).; Damage repair for mast arm at Hanover Street/I-93 Exit 6 Connector Rd in Manchester (S-285-04) This project consists of signal work at three (3) locations: Greenland-Portsmouth along NH 33, Manchester at I-93 Southbound at Exit 6 and Merrimack on the FEET Southbound at Exit 10. Question Deadline - 08/27/2026 Bidders should act promptly and submit all questions pertaining to the project in writing to Desiree Carron at Desiree.D.Carron@dot.nh.gov at least five (5) business days before the hour and date set for the bid opening. No phone calls or faxes will be accepted. All individuals, firms, partnerships or corporations intending to bid, before obtaining plans and specifications, must file with the Department of Transportation on forms prepared for that purpose at least ten (10) days prior to opening of bids, a statement showing their qualifications. No valid bidding proposal will be issued to a prospective bidder who is not qualified. The right is reserved to waive any informalities in or to reject any or all proposals. NH DOT - Fiber Optic Cable Installation NH 33

Award

$252,586.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
738
Active Projects
350
Bidding Soon
5,055
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2026

October 2, 2026

Project location map

Multiple Locations, Milford, NH

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed