BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2026 at 7:00 PM

Updated February 11, 2026

Demolition and renovation of an educational facility in Minneapolis, Minnesota. Completed plans call for the renovation of a educational facility; and for the demolition of a educational facility.

The project includes the design and provision to replace portions of the existing fire sprinkler system in Windom Elementary School, including demolition of portions of the existing system. The building shall be fully sprinklered at the completion of the project. The existing dry sprinkler system, which currently provides protection for both the Level 2 conditioned spaces and the combustible attic spaces above, will be separated into two systems: a wet sprinkler system for the Level 2 conditioned spaces and a dry sprinkler system for the attic spaces. Work includes modification of the existing sprinkler riser manifold in 04A Sprinkler Room on the ground level, provision of a new Nitrogen Generator, provision of a new FDC check valve, and all new electrical and fire alarm connections, which are to be tied into the existing fire alarm and building systems. All labor, materials, equipment, and incidentals necessary to complete the work in accordance with Drawings and Specifications are to be furnished. To furnish all labor, materials, equipment, and incidentals to complete all work for the FY26- Windom Elementary - Fire Sprinkler Upgrade project, in accordance with Drawings and Specifications prepared by KFI Engineers. a.Subcontractors: Women Business Enterprise Participation (WBE) 5% of Construction Cost Minority Business Enterprise Participation (MBE) 12% of Construction Cost b.Workers Women (Skilled and Unskilled) 20% of the Workforce Minority (Skilled) 8% of the Workforce Minority (Unskilled) 15% of the Workforce People of Color or Indigenous People 32% of the Workforce Minneapolis Residents 15% of the Workforce All questions must be answered. Incomplete forms will not be reviewed. Question Deadline 02/03/2026 Bidders and Sub-Bidders requiring clarification or interpretation of the Bidding Documents shall make a written request which shall reach the Architect at least 7 calendar days prior to the date for receipt of Bids.

Post-Bid

Educational

$500,000.00

Public - City

Demolition, Renovation

22

18

2

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
296
Active Projects
167
Bidding Soon
1,575
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2026

March 12, 2026

Project location map

5821 Wentworth Ave, Minneapolis, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.