Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 3, 2026 at 7:00 PM
Updated February 11, 2026
Demolition and renovation of an educational facility in Minneapolis, Minnesota. Completed plans call for the renovation of a educational facility; and for the demolition of a educational facility.
The project includes the design and provision to replace portions of the existing fire sprinkler system in Windom Elementary School, including demolition of portions of the existing system. The building shall be fully sprinklered at the completion of the project. The existing dry sprinkler system, which currently provides protection for both the Level 2 conditioned spaces and the combustible attic spaces above, will be separated into two systems: a wet sprinkler system for the Level 2 conditioned spaces and a dry sprinkler system for the attic spaces. Work includes modification of the existing sprinkler riser manifold in 04A Sprinkler Room on the ground level, provision of a new Nitrogen Generator, provision of a new FDC check valve, and all new electrical and fire alarm connections, which are to be tied into the existing fire alarm and building systems. All labor, materials, equipment, and incidentals necessary to complete the work in accordance with Drawings and Specifications are to be furnished. To furnish all labor, materials, equipment, and incidentals to complete all work for the FY26- Windom Elementary - Fire Sprinkler Upgrade project, in accordance with Drawings and Specifications prepared by KFI Engineers. a.Subcontractors: Women Business Enterprise Participation (WBE) 5% of Construction Cost Minority Business Enterprise Participation (MBE) 12% of Construction Cost b.Workers Women (Skilled and Unskilled) 20% of the Workforce Minority (Skilled) 8% of the Workforce Minority (Unskilled) 15% of the Workforce People of Color or Indigenous People 32% of the Workforce Minneapolis Residents 15% of the Workforce All questions must be answered. Incomplete forms will not be reviewed. Question Deadline 02/03/2026 Bidders and Sub-Bidders requiring clarification or interpretation of the Bidding Documents shall make a written request which shall reach the Architect at least 7 calendar days prior to the date for receipt of Bids.
Post-Bid
Educational
$500,000.00
Public - City
Demolition, Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 10, 2026
March 12, 2026
5821 Wentworth Ave, Minneapolis, MN
Related To This Project
Minneapolis, MN
--
Minneapolis, MN
--
Minneapolis, MN
--
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Jan 28 2026
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Feb 10 2026
Minneapolis, MN
Bid Date: Mar 16 2026
Minneapolis, MN
Bid Date: Jan 20 2026
Minneapolis, MN
Bid Date: Feb 12 2026
Minneapolis, MN
Bid Date: Jan 28 2026
Minneapolis, MN
Bid Date: Jan 27 2026
Minneapolis, MN
Bid Date: Feb 02 2026
Minneapolis, MN
Bid Date: Feb 12 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
