BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2026 at 7:00 PM

Updated March 4, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Arimo, Idaho. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

**As of March 3rd, 2026, the project was awarded to Cannon Builders, with an awarded amount of $1,333,176.13** Hawkins Road over Marsh Creek, Bannock County Existing Bridge Key Number 22035 is in Bannock County and carries Hawkins Road over Marsh Creek. The bridge is owned and maintained by Bannock County and is located approximately 6.0 miles south of Arimo, ID. This proposal is for the contractor to remove the existing concrete bridge with concrete foundations and replace it with a single span pre-stressed concrete girder bridge with reinforced concrete abutments on piles. The road will be closed during construction and traffic will be detoured. Additional work includes roadway approach construction and permitted stream alterations including placing riprap. The bridge is owned and maintained by Bannock County and is located approximately 6.0 miles south of Arimo, ID. January 26, 2026 at 5:00 pm MST is the last time technical questions or clarification requests will be accepted

Award

Bridges / Tunnels

$1,333,176.00

Public - County

Demolition, New Construction, Paving, Site Work

88

11

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
1
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2026

April 1, 2026

Project location map

Hawkins Rd, Arimo, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.