Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 3, 2026 at 7:00 PM
Updated February 5, 2026
Renovation of a municipal facility in Silver City, New Mexico. Completed plans call for the renovation of a municipal facility.
Gas furnace installation services including procurement, demolition, removal, disposal, delivery, installation, connection, and reconnection of a Lennox ML196DF090XE48CK 90,000 BTU Gas Furnace or approved equivalent. Work shall include all necessary materials and supplies such as condensate line, LP kit, insulated metal duct, gas line, and PVC flue, along with labor to complete the installation. Contractors must demonstrate technical capability through tools, equipment, training, and business practices, and provide detailed information on experience performing similar work. Past performance within the last three years must be documented, including project details, dollar value, period of performance, description of work, and customer references. Pricing shall include unit costs for all parts and labor, rounded to two decimals, in U.S. dollars. Estimated Period of Performance: February 2, 2026-April 1, 2026 Questions: All questions regarding this solicitation must be submitted to shavera.leveille@usda.gov no later than 1700 MST January 14, 2026. Questions will only be accepted via email. he Contractor and onsite installation crew shall have an HVAC technician certification and all work and equipment shall adhere to industry standards including, but not limited to, ASHRAE standards, (NEC) National Electric Code, and UMC Uniform Mechanical Code(UMC), NFPA 90A and 90B. Specific Tasks: 1. Furnace Replacement: - Remove and dispose of the existing gas furnace. - Install the new Lennox ML196DF090XE48CK 90,000 BTU furnace or approved equivalent. 2. Component Installation: - Install and connect the following components: - Condensate line. - LP Kit. - Insulated metal duct -R/A drop. - Gas line - final connection. - Flue - PVC. 3. Re-connect AC Condenser unit outside that will need to be reconnected to the new unit. 4. Testing and Commissioning: 5. Perform operational tests to ensure the furnace and AC unit is fully functional and meets safety and performance standards. - Provide a detailed report confirming completion and functionality.
Award
Municipal
$7,252.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 19, 2026
February 2, 2026
To Be Determined, Silver City, NM
Related To This Project
Silver City, NM
Bid Date: Jan 23 2026
Silver City, NM
Bid Date: Dec 02 2025
Silver City, NM
--
Silver City, NM
Bid Date: Aug 14 2025
Silver City, NM
Bid Date: Jul 14 2025
Silver City, NM
Bid Date: Sep 30 2025
Silver City, NM
Bid Date: May 25 2020
Silver City, NM
Bid Date: Sep 18 2020
Silver City, NM
Bid Date: Mar 24 2025
Silver City, NM
Bid Date: Apr 15 2025
Silver City, NM
--
Silver City, NM
--
Silver City, NM
--
Silver City, NM
Bid Date: Aug 05 2024
Silver City, NM
Bid Date: Aug 12 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
