BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2026 at 8:00 PM

Updated March 12, 2026

Demolition, site work and asbestos abatement for a municipal facility in Weed, California. Working plans call for the demolition of a municipal facility; for site work for a municipal facility; and for asbestos abatement for a municipal facility.

**As of March 11, 2026, bids received were withdrawn. Project will be rebid soon.** City of Weed, a California municipal corporation ("City"), invites proposals from qualified, properly licensed contractors to provide complete demolition, asbestos abatement, hazardous materials handling, and environmental remediation services for multiple fire-damaged properties located within the City's downtown core. The City intends to award one (1) contract to a single contractor for all sites described herein. The services under this RFP will apply to the following properties (collectively, the "Project Sites"): 219 Main Street, Weed, California 247 Main Street, Weed, California 259 Main Street, Weed, California The City reserves the right to sequence, bundle, or phase work across sites at its sole discretion. The selected contractor shall provide complete demolition, abatement, and environmental remediation services for all Project Sites, including but not limited to: Full demolition and removal of all fire-damaged structures. Licensed asbestos abatement, including removal and disposal of Regulated Asbestos-Containing Material (RACM). Lead-safe demolition and debris handling in compliance with Cal/OSHA requirements. Identification, handling, transport, and disposal of petroleum-impacted and other regulated debris. Environmental remediation as required to achieve site clearance. Backfilling, compaction, and bringing each site back up to grade as necessary to leave the properties in a safe, stable, and maintainable condition. Compliance with all applicable federal, state, and local laws and regulations, including EPA NESHAP, Cal/OSHA, DTSC, CARB, and applicable air quality authorities. All communications regarding this RFP shall be directed as follows: Administrative / Contractual Questions: Dustin Stambaugh, City Manager, dstambaugh@ci.weed.ca.us Sandra Duchi, City Clerk, Sandra.duchi@ci.weed.ca.us Technical Questions: Chris Davis, Public Works Director, davis@ci.weed.ca.us

Final Planning

Municipal

$1,500,000.00

Public - City

Asbestos Abatement, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
0
Bidding Soon
101
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2026

September 14, 2026

Project location map

Multiple Locations, Weed, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.