Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 13, 2026 at 7:00 PM
Updated January 16, 2026
Site work, paving and new construction of an educational facility in Ingleside, Texas. Design plans call for the construction of a 17,600-square-foot educational facility; for site work for a educational facility; and for paving for a educational facility.
Plans call to construct 17,600 square-foot building. The new gymnasium project for Ingleside ISD High School is a state-of-the-art facility designed to support a wide range of athletic and training activities for students. The comprehensive design includes an indoor practice field, coach’s offices, an athletic training area, a weight room, a film room, boys and girls locker rooms, and a laundry room. These facilities are aimed at providing a conducive environment for physical education, sports training, and competitive events. Indoor Practice Field The indoor practice field is designed to provide a versatile space for various sports practices and training sessions, ensuring that activities can continue regardless of weather conditions. Coach’s Offices Dedicated offices for coaches provide a professional space for planning, meetings, and administrative tasks, helping them manage their teams effectively and provide guidance and support to student-athletes. Athletic Training Area An athletic training area is available to support injury prevention and rehabilitation. This space is equipped with essential medical supplies and equipment to provide immediate care to athletes and ensure their safety and well-being. Weight Room The weight room is outfitted with modern exercise equipment to support strength training and conditioning programs. This facility is designed to help students and athletes improve their physical fitness and overall health. Film Room A film room is included to facilitate team meetings and review sessions, allowing coaches and athletes to analyze performance, develop strategies, and improve their game. Locker Rooms Separate boys and girls locker rooms are provided, each equipped with showers, lockers, and changing areas. These spaces ensure that students have a private and secure place to prepare for and recover from physical activities. Laundry Room A laundry room is available to manage athletic uniforms and gear, ensuring that students have access to clean and well-maintained equipment. As of January 13, 2026, the project is in design. Construction is slated to begin on February 28, 2026, with completion date of May 31, 2027.
Design
Educational
$14,000,000.00
Public - City
New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 28, 2026
2807 Mustang Dr, Ingleside, TX
Related To This Project
Ingleside, TX
Bid Date: Feb 17 2026
Ingleside, TX
Bid Date: Feb 04 2026
Ingleside, TX
Bid Date: Oct 21 2025
Ingleside, TX
Bid Date: Oct 02 2025
Ingleside, TX
Bid Date: Sep 17 2025
Ingleside, TX
Bid Date: Sep 17 2025
Ingleside, TX
--
Ingleside, TX
--
Ingleside, TX
Bid Date: Jul 16 2025
Ingleside, TX
Bid Date: Jul 16 2025
Ingleside, TX
--
Ingleside, TX
Bid Date: Feb 26 2025
Ingleside, TX
Bid Date: Jan 31 2025
Ingleside, TX
--
Ingleside, TX
Bid Date: Dec 04 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
