BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2026 at 7:00 PM

Updated January 16, 2026

Site work, paving and new construction of an educational facility in Ingleside, Texas. Design plans call for the construction of a 17,600-square-foot educational facility; for site work for a educational facility; and for paving for a educational facility.

Plans call to construct 17,600 square-foot building. The new gymnasium project for Ingleside ISD High School is a state-of-the-art facility designed to support a wide range of athletic and training activities for students. The comprehensive design includes an indoor practice field, coach’s offices, an athletic training area, a weight room, a film room, boys and girls locker rooms, and a laundry room. These facilities are aimed at providing a conducive environment for physical education, sports training, and competitive events. Indoor Practice Field The indoor practice field is designed to provide a versatile space for various sports practices and training sessions, ensuring that activities can continue regardless of weather conditions. Coach’s Offices Dedicated offices for coaches provide a professional space for planning, meetings, and administrative tasks, helping them manage their teams effectively and provide guidance and support to student-athletes. Athletic Training Area An athletic training area is available to support injury prevention and rehabilitation. This space is equipped with essential medical supplies and equipment to provide immediate care to athletes and ensure their safety and well-being. Weight Room The weight room is outfitted with modern exercise equipment to support strength training and conditioning programs. This facility is designed to help students and athletes improve their physical fitness and overall health. Film Room A film room is included to facilitate team meetings and review sessions, allowing coaches and athletes to analyze performance, develop strategies, and improve their game. Locker Rooms Separate boys and girls locker rooms are provided, each equipped with showers, lockers, and changing areas. These spaces ensure that students have a private and secure place to prepare for and recover from physical activities. Laundry Room A laundry room is available to manage athletic uniforms and gear, ensuring that students have access to clean and well-maintained equipment. As of January 13, 2026, the project is in design. Construction is slated to begin on February 28, 2026, with completion date of May 31, 2027.

Design

Educational

$14,000,000.00

Public - City

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
37
Bidding Soon
354
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2026

Project location map

2807 Mustang Dr, Ingleside, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.